
-
-
INSTALLATION
ENGLISH
FLUE GAS EXHAUST CONNECTION
The boiler operates by combustion in a sealed chamber and therefore does not require any particular ventilation, and can
also be housed in compartments, storerooms, technical spaces, etc. There are also various possibilities for exhaust of
the combustion products and intake of air from the outside. The boiler can be fitted with two types of basic intake/exhaust
systems.
- Concentric exhaust/intake
- Split exhaust/intake
The boiler can therefore be connected to concentric flues, ventilation flues, separate stacks, etc. by means of the kits
provided. Some possible solutions are schematised below.
EXHAUST/INTAKE
1
Concentric from roof C32
2
Concentric from terrace C32
3
Split into separate flues C42
4
Concentric with connection to concen-
tric flues C42
5
Concentric from external wall C12
6
Split from terrace C52
7
Split from single flue C82
8
Split C62
For positioning and the distances of the draft terminals from windows, doors, etc.
consult the regulations in force
.
Содержание ALMA 24 MBS W TOP
Страница 2: ......
Страница 34: ...34 INSTALLAZIONE Aprire il cruscotto Per togliere il cofano del cruscotto togliere le viti 2...
Страница 74: ...74 INSTALLATION Open the instrument panel To remove the instrument panel lid remove the screws 2...
Страница 114: ...114 INSTALACI N Abrir panel de mandos Para extraer la tapa del panel de mandos extraer los tornillos 2...