
-
-
INSTALLATION
TURNING ON
FILLING THE SYSTEM
Slowly open the feed cock until the system reaches a pressure of 1.5 bar indicated on the hydrometer and then close it.
Check that the cap on the automatic air escape valve positioned on the circulator is loosened, and repeatedly activate the
circulator to release the air in the circuit.
TURNING ON
Open the gas cock and turn the selector to the desired position. The burner will automatically turn on.
Should the burner fail to turn on, check if the locking warning light is on and, if so, turn the selector to the RESET position
so that the ignition operation is repeated.
Subsequently, adjust the heating and sanitary water temperature as desired using the dedicated selectors.
Содержание ALMA 24 MBS W TOP
Страница 2: ......
Страница 34: ...34 INSTALLAZIONE Aprire il cruscotto Per togliere il cofano del cruscotto togliere le viti 2...
Страница 74: ...74 INSTALLATION Open the instrument panel To remove the instrument panel lid remove the screws 2...
Страница 114: ...114 INSTALACI N Abrir panel de mandos Para extraer la tapa del panel de mandos extraer los tornillos 2...