![lamber M115 Скачать руководство пользователя страница 32](http://html2.mh-extra.com/html/lamber/m115/m115_instruction-manual_3449700032.webp)
32
VAPOURS SUCTION
For machines equipped with splashguard
with collar or normal collar, carry out the
necessary connection as showed in fig. 4.
In any case it is necessary to provide a
way to scavenge steam through a hood
or a similar system.
TESTING
Before starting machine:
During the testing operations, prior to
switching the dishwashing machine on,
check that thermostat of the rinsing boiler
(0°-90° C) is set to zero and the direction of
rotation of the pumps is correct.
Should the pumps rotate in the reverse
direction, reverse two wires of the line .
Make a number of empty racks to pass
through, then check that water jets are
sprinkled fron the rinsing nozzles then
adjust the thermostat of the boiler to 85° C.
WORKING TEMPERATURES
Check that the thermostats are set
according to the following working
temperatures.
WASHING
The tank thermostat
(CT3)
, also placed
near the wash tank, will be set according
to the following temperature:
Washing water: 55÷60°C.
RINSING
The rinsing thermostat
(CT2)
will be set
according to the following temperature:
Rinsing water: 80÷85°C.
DO NOT TAMPER WITH THE
THERMOSTAT CALIBRATION
Содержание M115
Страница 1: ...DISHWASHERS WITH PULL THROUGH RACK INSTRUCTIONS MANUAL M115 R06 2012...
Страница 2: ......
Страница 5: ...5 WASHING RINSING M O D E L M O D E L M115 left right M115 right left...
Страница 13: ...INSTRUCTIONS FOR THE USER...
Страница 26: ...26...
Страница 41: ...41 TABLE CONNECTION SCHEME MURO MUR WALL WAND Piano di lavoro plan de travail work table Arbeitstisch...
Страница 42: ...42...