UNPACKING AND DELIVERY CHECKS
When the case with the machine has been received, unpack it as follows:
- Remove the upper cover and the wooden case side walls, take care not to damage
the machine,
- Remove possible accessories boxes,
- Remove the protecting cellophane,
- Make sure that the machine has not been damaged during transport,
- Make sure that all covers and panels have been correctly fixed and that no loosen
part is present,
- Visually inspect that all electrical components are integral.
TRANSPORT AND INSTALLATION
- To lift and transport the machine, insert the truck forks under the frame connected to
the points indicated by the yellow adhesives applied on the machine front side (see
draw below).
disforchem115
draw
“A”*
- Before plugging the machine, make sure that the supply voltage of the domestic
wiring system and the water supply from water connection corresponds to the ones
reported on the rating plate
- Installation should be carried out by qualified personnel according to the
manufacturer's indications
During instalation, it is recommended to level the machine in order to ensure a correct
operation.
Содержание M115
Страница 1: ...DISHWASHERS WITH PULL THROUGH RACK INSTRUCTIONS MANUAL M115 R06 2012...
Страница 2: ......
Страница 5: ...5 WASHING RINSING M O D E L M O D E L M115 left right M115 right left...
Страница 13: ...INSTRUCTIONS FOR THE USER...
Страница 26: ...26...
Страница 41: ...41 TABLE CONNECTION SCHEME MURO MUR WALL WAND Piano di lavoro plan de travail work table Arbeitstisch...
Страница 42: ...42...