background image

Appendix C: Protector Radioisotope Specifications 

 

Product Service 1-800-522-7658 

50 

Original instructions 

 

 

 

Содержание Protector 1204 Series

Страница 1: ...Protector Stainless Steel Radioisotope Laboratory Fume Hoods Models 1204 Series 1205 Series 1206 Series 1207 Series...

Страница 2: ...5 30 p m Central Standard Time Part 9411000 Rev E ECO L354 Warranty Labconco Corporation provides a warranty to the original buyer for the repair or replacement of parts and reasonable labor as a resu...

Страница 3: ...NG STARTED 10 Unpacking Your Fume Hood 11 Removing the Shipping Skid 11 Sash Weight Release 12 Installing the Hood on a Supporting Structure Hardboard Work Top 12 Connecting to the Hood Exhaust System...

Страница 4: ...TOPE 34 Installing Hardboard Support Surface 34 Installing Ceiling Enclosures Above the Fume Hood 35 Installing Rear Panels Behind the Fume Hood 37 Installing Guardian Airflow Monitors 37 Sash Stop Ki...

Страница 5: ...mum safety in a laboratory while using low level Alpha and lower level Beta particles and effectively contain toxic noxious or other harmful materials when properly installed The Protector Radioisotop...

Страница 6: ...ons for installing optional equipment on your hood are also included Chapter 1 Introduction provides a brief overview of the laboratory fume hood explains the organization of the manual and defines th...

Страница 7: ...ur laboratory fume hood including the probable causes of the problems and suggested corrective actions Appendix A Protector Radioisotope Components contains labeled diagrams of all of the components o...

Страница 8: ...es en gras dans les paragraphes qui sont pr c d s par l ic ne de cl plate Ces op rations devraient tre seulement ex cut es par un professionnel agr e L chec pour se conformer aux informations qui suiv...

Страница 9: ...laboratory fume hoods operate go to Chapter 4 Performance Features and Safety Precautions For information on the operational characteristics of your laboratory fume hood go to Chapter 5 Using The Pro...

Страница 10: ...located near the installation site Carefully read this chapter to learn the requirements for your installation site The location requirements The support requirements The exhaust requirements The opti...

Страница 11: ...tationary The supporting structure usually consists of a base cabinet and chemically resistant work surface NE PAS installer la hotte aspirante sur un chariot ou un banc mobile TOUTES les installation...

Страница 12: ...rician Refer to Chapter 3 Getting Started and Appendix C Protector Radioisotope Specifications for the wiring diagram for proper electrical installation Les mod les Prot ge capot disposent c blage int...

Страница 13: ...as and equipped with an easily accessible shut off valve should disconnection be required Recommended operating pressure is 40 PSI with a maximum allowable pressure of 200 PSI Consider a pressure regu...

Страница 14: ...and electrical installation tools in addition to 5 16 3 8 7 16 and 1 2 wrenches ratchets sockets a nut driver set a flat blade screwdriver a Phillips screwdriver and a carpenter level to complete the...

Страница 15: ...u have checked all of the components and installed and tested the unit The Perchloric Acid fume hood baffle is installed as shown in Figure 1 1 Do not remove the fume hood from its shipping skid until...

Страница 16: ...lling the Protector Radioisotope Hood onto the lower hardboard work top ensure that the structure can safely support the combined weight of the fume hood and any related equipment The hardboard work t...

Страница 17: ...code in your area Figure 3 1 5 Secure the hardboard surface to the top of the base cabinet s using adhesives with the Storage Cabinet s Be sure the Radioisotope Hood drain trough is accounted for in...

Страница 18: ...Chapter 3 Getting Started Product Service 1 800 522 7658 14 Original instructions Rear Wall Place Cross Support Here Figure 3 2...

Страница 19: ...e install par un entrepreneur HVAC qualifi La connexion d chappement sur votre hotte est fabriqu e avec 11 d acier de type 304 diam tre nominal inoxydable 11 00 OD pour permettre une perte de pression...

Страница 20: ...Used filters contain hazardous material Observe all federal state and local EPA regulations for their handling and disposal AVERTISSEMENT IMPORTANT Les filtres usag s contiennent des mati res dangereu...

Страница 21: ...10A or 20A electrical service The single point internal junction box is used for the connection of the lights blower and duplex outlets Refer to the wiring diagram for your Protector Radioisotope in A...

Страница 22: ...nduit to protect the wiring into the hood The grounding connection shall not be made to the terminal box cover Tout le c blage lectrique pour la hotte aspirante devrait tre ex cut par un lectricien ag...

Страница 23: ...erche de fuite Resserrer les installations l g rement si n cessaires CAUTION Do not use oxygen with any standard service fixture Contact Labconco Customer Service for oxygen fixture information PRUDEN...

Страница 24: ...change the airflow at the sash opening of your hood To determine the actual face velocity at the sash opening airflow velocity readings will need to be taken This should be done across the sash openin...

Страница 25: ...tion involves the use of organic solvents that can result in reductions of contamination of up to 75 Even though the stainless steel seams are smooth to the touch there are microscopic voids within th...

Страница 26: ...28 operating height Exhaust volume and blower sizing are based on the 28 height Optional sash stops are available to limit sash height and reduce energy usage The Perchloric Acid Hood has a glass sas...

Страница 27: ...ally to conserve energy Optional sash stops prevent raising the vertical sash above the half open and fully closed positions unless manually defeated by the operator 16 Outside frame of epoxy coated s...

Страница 28: ...Chapter 4 Performance Features Safety Precautions Product Service 1 800 522 7658 24 Original instructions Figure 4 1 17 16 6 5 11 20 12 10 9 1 15 8 18 14 13 4 7 21...

Страница 29: ...OD INTERIOR INCLUDING FLUORESCENT LIGHT GLASS PANEL REPLACE BURNED OUT LIGHT BULBS TO MAINTAIN MAXIMUM ILLUMINATION DO NOT OVERLOAD THE WORK SURFACE WITH APPARATUS OR WORK MATERIAL THE SAFE OPERATION...

Страница 30: ...k in hood as possible It is best to keep all chemicals and apparatus 6 inside the front of the hood Toujours travailler aussi loin que possible de la hotte Il est recommand de garder tous les produits...

Страница 31: ...service any electrical components without first disconnecting the hood from electrical service Proper operation of the fume hood depends largely upon the hood s location and the operator s work habits...

Страница 32: ...operating height The airflow requirements should be sized for the 28 operating height if using sash stops then the airflow requirements can be reduced by approximately 40 at 18 or approximately 50 at...

Страница 33: ...ower Slowly raise the sash Check the baffle air slots for obstructions Allow the hood to operate unobstructed for 5 minutes Wear a long sleeved lab coat and rubber gloves Use protective eyewear Wear a...

Страница 34: ...rfaces with water is standard practice and results in about 50 reduction of contamination on the 304 stainless steel liner material due to radiochemicals A secondary means of surface decontamination i...

Страница 35: ...per personal protective equipment and procedure Since some service operations require a step ladder always use proper safety and consult your safety officer If performing maintenance on any service li...

Страница 36: ...ent entra n L ic ne de cl plate pr c de les op rations d entretien qui exigent des techniciens qualifi s Routine Maintenance Schedule Weekly Using ordinary dish soap to clean the surface inside of the...

Страница 37: ...tifier la hotte aspirante par un technicien agr en certification Voir au Chapitre 3 Certifier la Hotte Aspirante Protecteur All monthly activities Toutes les activit s mensuelles Biannually The sash a...

Страница 38: ...r monitor electrical duplex outlets ceiling enclosures and rear panels Installing Hardboard Support Surface Your Protector Radioisotope Fume Hood requires a hardboard support surface to properly suppo...

Страница 39: ...ght Ceiling Enclosure Kit Catalog Number Use this key to configure the seven digit catalog number to order your 3 Sided Fixed Height Ceiling Enclosure Kit For example 9550501 is a 3 Sided Ceiling Encl...

Страница 40: ...og number 3 3 XL Benchtop only 4 4 5 5 6 6 7 7 XL Benchtop only 8 8 STEP 2 Select the depth based on the model chosen Choose 0 for Premier and 1 for XStream Choose 1 for PVC Choose 0 1 or 2 for the co...

Страница 41: ...ss Through Fume Hood Contact Labconco Customer Service for ordering information Installing Guardian Digital Airflow Monitor or Guardian Airflow Monitor The Guardian Airflow Monitors continuously monit...

Страница 42: ...can be ordered with duplex outlets however if you ordered a model without an electrical duplex outlet you can have one installed in the field by a qualified electrician Contact Labconco Customer Servi...

Страница 43: ...tches Check connection of switches Check connection to control box on top of unit Circuit breakers tripped in building electrical supply Reset circuit breakers Remote blower won t operate but lights w...

Страница 44: ...acting as a source of contamination See Location Requirements Chapter 2 Certifying the Hood Chapter 3 and Safety Precautions Chapter 4 sections of this manual Ref Appendix D Fume hood has improper fac...

Страница 45: ...r have power Wires not connected or faulty duplex Check wire connection or replace duplex Circuit breakers tripped in building electrical supply Reset circuit breakers Service valves no longer operate...

Страница 46: ...e Connector STEAM BLK 2H 1 9826808 WaterSaver Valve Connector NITROGEN BRN 2I 1 9826809 WaterSaver Valve Connector OXYGEN LIGHT GREEN 2J 1 9826810 Swivel Gooseneck only GRN 2K 1 9826812 Swivel Goosene...

Страница 47: ...ug Fills cutout when switch is not used 11 1 9818400 Access Cover 12A 1 9409800 Side Panel 24 internal deep hoods 12B 4 1885308 Screw Machine 10 24 x 50 Phillips 13A 1 9466400 Eco Foil 4 13B 1 9466401...

Страница 48: ...Appendix A Protector Radioisotope Components Product Service 1 800 522 7658 44 Original instructions Figure A 1 8 12 10 21 2 5 6 13 17 4 7 1 3 11 22 14 15 16...

Страница 49: ...1 800 522 7658 45 APPENDIX B PROTECTOR RADIOISOTOPE DIMENSIONS Radioisotope Model Widths 4 5 6 8 A 48 00 60 00 72 00 96 00 B 38 25 50 25 62 25 86 25 Dimensions in inches CAD layouts available upon req...

Страница 50: ...Appendix B Protector Radioisotope Dimensions Product Service 1 800 522 7658 46 Original instructions Figure B 2...

Страница 51: ...Appendix B Protector Radioisotope Dimensions Product Service 1 800 522 7658 47 Original instructions Figure B 3...

Страница 52: ...Appendix B Protector Radioisotope Dimensions Product Service 1 800 522 7658 48 Original instructions Figure B 4...

Страница 53: ...ltage Transient over voltages according to Installation Categories II Over voltage Categories per IEC 1010 Temporary voltage spikes on the AC input line that may be as high as 1500V for 115V models an...

Страница 54: ...Appendix C Protector Radioisotope Specifications Product Service 1 800 522 7658 50 Original instructions...

Страница 55: ...Appendix C Protector Radioisotope Specifications Product Service 1 800 522 7658 51 Original instructions...

Страница 56: ...exes on hood noted amperage applies B This fume hood includes one additional electrical receptacle individually wired to the field wired box and individually rated as 115V single phase 60Hz 20 Amps Ea...

Страница 57: ...xes may be ganged together on the same circuit with the total load of the ganged duplexes not exceeding the 10A electrical service they are wired to H This fume hood includes three additional electric...

Страница 58: ...xes may be ganged together on the same circuit with the total load of the ganged duplexes not exceeding the 10A electrical service they are wired to N This fume hood includes four additional electrica...

Страница 59: ...tiers c bl es individuellement et class comme 115V monophas 60 Hz 20 amp res Chaque duplex peut tre branch sur un circuit d di valu 20A ou les duplex peuvent tre group s ensemble sur le m me circuit q...

Страница 60: ...ent et class comme 230V monophas 60 Hz 10 amp res Chaque duplex peut tre branch sur un circuit d di class au 10A ou les duplex peuvent tre group s ensemble sur le m me circuit que la charge totale des...

Страница 61: ...ge totale des duplex coupl es ne d passant pas le service lectrique 10A ils sont c bl s N Cette hotte comprend quatre autres prises lectriques individuellement c bl s la bo te c bl es individuellement...

Страница 62: ...od face velocities between 60 100 lfpm Maximum of 125 lfpm for radioisotope hoods Duct velocities of 1000 2000 fpm for vapors gasses and smoke Stack discharge height 1 3 2 0 x building height Well des...

Страница 63: ...ng Chemicals Laboratory hoods should not be relied on for explosion protection Exhaust air from fume hoods should not be recirculated Services should be external to the hood Canopy hoods only for non...

Страница 64: ...worth Publishers 1985 Miller Brinton M et al Laboratory Safety Principles and Practices American Society for Microbiology Washington D C 1986 NIH Guidelines for the Laboratory Use of Chemical Carcinog...

Отзывы: