Page 76
LAARS Heating Systems
Select one of the controllers listed on the right side
of the screen. Press one of the buttons below the
right column to see the snapshot. See Menu 18.
Menu 18. Typical Control Snapshot
The Show Status button captures the current status
of the I/O of the control only. Show Confi guration
captures the current parameter settings and the
control setup. You can save the snapshot, give it a
name, or send a copy to the USB port.
11.8 Operating Sequence
When there is a call for heat, the unit will close
pump contacts to energize the customer supplied
relay/contactor to start water fl ow. Once the LCI
circuit (fl ow switch, gas pressure switches, LWCO,
and High Limit aquastats) are completed the unit
will start the blower and begin the ignition sequence.
NeoTherm is equipped with a low and high fi re air
pressure switch. The unit will pre-purge at 65% fan
for 30 seconds and prove fan through the blocked
intake switch. Once fan is proven, the blower will
proceed to 24% and the 10 second Pre-ignition timer
will begin to make the ignitor spark.
Once the Pre-ignition timer has expired the control
will open the Pilot solenoid and the Pilot Flame
Establishing Period (PFEP) will start for 10
seconds to establish fl ame. Once fl ame has been
established and the 10 second timer has expired
the control will open the main valve and the Main
Flame Establishing Period will begin for a period
of 5 seconds. If fl ame is established within those 5
seconds then unit will proceed to Run, if fl ame does
not establish the unit will post-purge to 100% for
30 seconds and the sequence for ignition will begin
again. For Non CSD-1 units retry for ignition is 3
times before Lockout 109 (Ignition Failure) occurs.
For CSD-1 units there is a single retry before
Lockout 109 occurs.
Содержание NTV
Страница 4: ...LAARS Heating Systems...
Страница 11: ...Page 7 NEOTHERM Boilers and Water Heaters...
Страница 24: ...Page 20 LAARS Heating Systems Figure 16 Hydronic Piping Single Boiler Zoning with Circulators...
Страница 26: ...Page 22 LAARS Heating Systems Figure 18 Hydronic Piping Multiple Boilers Zoning with Circulators...
Страница 84: ...Page 80 LAARS Heating Systems Parts Illustration 1 Jacket Components...
Страница 86: ...Page 82 LAARS Heating Systems Parts Illustration 4 Internal Components Sizes 750 850...
Страница 88: ...Page 84 LAARS Heating Systems Parts Illustration 6 Gas Train Components Sizes 600 850...
Страница 89: ...Page 85 NEOTHERM Boilers and Water Heaters Parts Illustration 7 Heat Exchanger Components 68A Sizes 285...
Страница 90: ...Page 86 LAARS Heating Systems Parts Illustration 8 Electrical Components Front Battery CR2032 Touchscreen Back...
Страница 91: ...Page 87 NEOTHERM Boilers and Water Heaters Notes...