TABLE OF CONTENTS
SECTION 1 GENERAL INFORMATION
1.A
Introduction .............................................
4
1.B
Warranty .................................................
4
1.C
Model Number and Nomenclature .........
4
1.D
Safety Warnings .....................................5
1.E
Model Overview ......................................
6
1.F
Pressure Gauge .....................................8
1.G
Digital Dashboard ...................................8
1.H
The Installation Kit ..................................8
1.I
Accessory Kits Available.........................8
1.J
Dimensions .............................................8
SECTION 2 LOCATING THE BOILER
2.A
Field Assembly .....................................
10
2.B
Boiler Placement ..................................
10
2.C
Clearances ...........................................
10
SECTION 3 AIR AND VENTING
3.A
Safety Warnings ...................................
11
3.B
Combustion Air Supply .........................
12
3.C
Venting .................................................13
3.D
Vertical Venting - Category I ................
14
3.E
Locations for Vent Pipe Terminator.......15
3.F
Venting with a Power Venter ...............
16
3.G
Common Vent Test ...............................
16
SECTION 4 GAS CONNECTIONS
4.A
Gas Supply and Piping .........................17
4.B
LP Gas Conversion Kit .........................18
4.C
Special Precautions for LP Gas............18
SECTION 5 PUMP REQUIREMENTS
5.A
Pump Sizing WITH Low Loss
Header and an Integral Pump ..............
19
5.B
Pump Sizing WITHOUT
Low Loss Header .................................
19
SECTION 6 WATER CONNECTIONS
6.A
Water Piping .........................................
20
6.B
Oxygen Permeable Systems ................
20
6.C
Anti-freeze ............................................
20
6.D
Typical Plumbing Diagrams ..................
21
SECTION 7 ELECTRICAL AND
WIRING DIAGRAMS
7.A
Safety Warnings ...................................23
7.B
Main Power, 120V / 15 Amp Circuit ......23
7.C
Outdoor Sensor ....................................23
7.D
Field Connections ..............................
24
7.D.1 TB1 (Term Block 1 -TT, DHW, OAS) .
24
7.D.1.a TT (Central Heat)..................................
24
7.D.1.b DHW. ...................................................
24
7.D.1.c Field Interlocks .....................................
24
7.D.1.d PV Terminals .......................................
24
7.D.1.e WWSD + COM ....................................
24
7.D.1.f OAS + COM .........................................
24
7.D.2 TB2 (for pumps and aux power) .......
25
7.D.2.a Boiler Pump ..........................................25
7.D.2.b SYS Pump ............................................25
7.D.2.c Aux Power ............................................25
7.D.3 TB3 (for optional equipment) ............
25
7.D.3.a DHW Pump ..........................................25
7.D.3.b DHW Aquastat ......................................25
7.E
Wiring Connections,
Power Vent and Air ...............................
26
7.F
Wiring Diagram .....................................28
7.G
Logic Diagram ......................................
29
SECTION 8 THE DIGITAL DASHBOARD
8.A
Getting to know the Digital Dashboard. 30
8.A.1 The Lo Limit Dial
(Advanced Programing) .......................30
8.A.2 The Hi Limit Dial
(Program Select) ..................................30
8.A.3 Economy Dial
(no outdoor sensor needed) .................31
8.A.4 Mode ................................................31
8.A.5 Control LEDs .....................................31
8.A.5.a TS ACTIVE (TEMP) ............................31
8.A.5.b HIGH TEMP .........................................31
8.A.5.c LWS ACTIVE (LWCO) .........................31
8.A.5.d LOW WATER .......................................31
8.A.5.e TEMP ACTIVE (ECONOMY) ...............31
8.A.5.f TEMP TARGET ..................................31
8.A.6 Digital LEDs . ....................................31
8.A.7 Ignition LEDs .....................................32
8.A.7.a LIMITS .................................................32
8.A.7.b V-PWR ..................................................32
8.A.7.c V-SW ...................................................32
8.A.7.d FLAME .................................................32
LAARS Heating Systems