background image

HANDMADE IN FLORENCE

Also available in 

UL - NSF

 version

HANDMADE IN FLORENCE

GB/5

FB/80

La Marzocco

 s.r.l.

Via Bolognese 

68

 Pian Di San Bartolo 

50010

 Firenze, Italy

t:

 +39.055.401.390 

 f:

 +39.055.401.349

e-mail: [email protected]
www.lamarzocco.com

Operating Manual

available

Ver. 1.3

Содержание GB/5

Страница 1: ...Also available in UL NSF version HANDMADE IN FLORENCE GB 5 FB 80 Operating Manual available Ver 1 3...

Страница 2: ...pters 1 General Warnings and Safety Specifications 2 Definition of Available Models 3 Installation 4 Operating the Espresso Machine and Preparing Coffee 5 Preparing Other Hot Drinks 6 Preventative Mai...

Страница 3: ...ind which conforms to local national and international electrical codes and safety regulations being careful not to exceed the power and current ratings indicated on such adapters and extension cords...

Страница 4: ...Panel 6 Group 1 Keypad 7 Digital Display 8 Steam Wand 9 Steam Knob 10 Hot Water dispense nozzle 11 Removable Drain Tray 12 Manual Brew Switch EE model 13 Hot Water Switch EE model For additional infor...

Страница 5: ...st at a pressure of 18 bar and has an operating pressure of 9 bar The following table is a list of effective volumes and power ratings according to the number of groups installed 2 groups 3 4 liters 1...

Страница 6: ...V1 3 3 Installation Water Pump and Motor Water Filtration Softener Waste Drain Electrical Supply Connection Water Pump Motor Power Cord Power Supply Cord Drain Hose Connection Water Supply Connection...

Страница 7: ...ly with cold water Make sure that water is always present while the pump is operating otherwise air can be introduced into the brew boiler causing an undesireable condition 3 Electrical Connections a...

Страница 8: ...ee Boiler Filled should be displayed Press enter to confirm that the preceding procedures are complete The installation is now complete and the espresso machine should be heating to the operating temp...

Страница 9: ...d to prepare another cup and only at that time should you place a new dose of ground coffee in the filter The size of the coffee granules is extremely important in preparing a good cup of coffee other...

Страница 10: ...l you get the right amount of foam You can then pour this milk into a cup containing warm espresso and you will end up with a fresh cup of cappuccino In order to prevent the heated liquid from being s...

Страница 11: ...s listed below very carefully Diffuser Screen Group Assembly Diffuser Screw 6 Cleaning the Diffuser Screen Due to filter holder discharge operations subsequent to coffee brewing a certain amount of co...

Страница 12: ...to the water pump Remove the reinforced plastic tubing on the drain connection At this point the machine may be removed from the bar being very careful not to drop it or squash your fingers The machi...

Страница 13: ...y to the coffee boiler and are thus an integral part of the boiler itself The boiler assembly is shaped in such a way that each group is located at a greater height than the boiler so that just like i...

Страница 14: ...allows continuous brewing operation which can be interrupted by pressing the very same button again CONSTRUCTION DETAILS They consist essentially of 2 small boilers of which 1 Coffee Boiler hot water...

Страница 15: ...HANDMADE IN FLORENCE La Marzocco s r l Via Bolognese 68 Pian Di San Bartolo 50010 Firenze Italy t 39 055 401 390 f 39 055 401 349 e mail florence lamarzocco com www lamarzocco com...

Отзывы: