1
3
2
ON
English
11 EN
10. Daily operation
USE
“Before setting the machine to work, make sure that:
• the main electric power switch is on;
• the mains water tap has been turned on".
DT version with display
MANUAL POWERING
Press the luminous main switch.
The the keys light up and the following message will appear
on the display:
While waiting for the machine to be ready for use, insert
the
¿
lter holders in the units.
The machine is ready to work when the display indicates
the working pressure:
If the water level in the boiler is lower than the minimum
limit, the boiler will be
¿
lled to the right level. At the end of
this phase, the
icon will appear in the lower left hand
corner of the display.
The preset working pressure must be reached before the
machine is ready for use.
If one of the
keys is pressed during this phase, coffee
will be served at the temperature reached at that moment.
If any dispensing key is pressed, the following message will
appear on the display:
20
S
eptember 2017
wednesday
15:18:12
20
S
eptember 2017
wednesday
15:15:04
20
S
eptember 2017
wednesday
15:15:04
MACHINE COLD
PLEASE WAIT