Rigging procedures
13.
Tighten all the screws on the last enclosure.
Apply a torque of 5 N.m.
5 N.m
14.
Check that all screws are secured and tightened.
What to do next
• Exchange the Kara IIi grills so that the logo is positioned on the right-hand side:
(p.92),
• or secure a screen:
(p.94)
Kara IIi owner's manual (EN) version 2.0
91
Содержание Kara IIi
Страница 1: ...Kara IIi owner s manual EN ...
Страница 106: ...Corrective maintenance CONNECTOR PLATE HF DIAPHRAGM G03520 HF DRIVER G03521 106 Kara IIi owner s manual EN version 2 0 ...
Страница 130: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in 130 Kara IIi owner s manual EN version 2 0 ...
Страница 142: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...