Rigging procedures
Risk of crushing injury
Keep ngers away from underneath the enclosure.
4.
Secure additional SB18 IIi (equipped with rigging plates) on top of the rst one.
Adjusting the gap between stacked enclosures
Place a wedge or a lever between the two enclosures to align the rigging with the inserts.
Be careful not to scratch the paint.
The last SB18 IIi must be equipped with SB18IIi-ENDLINK.
5.
Remove the top rigging screws from the last SB18 IIi.
6.
Tighten all the screws on the array.
Apply a torque of 5 N.m.
Kara IIi owner's manual (EN) version 2.0
85
Содержание Kara IIi
Страница 1: ...Kara IIi owner s manual EN ...
Страница 106: ...Corrective maintenance CONNECTOR PLATE HF DIAPHRAGM G03520 HF DRIVER G03521 106 Kara IIi owner s manual EN version 2 0 ...
Страница 130: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in 130 Kara IIi owner s manual EN version 2 0 ...
Страница 142: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...