Rigging procedures
Kara IIi rear linking points
rigging accessory
inter-element angle
used inserts
0°, 2°, 4°, 7.5°
A
KARAIIi-LINK (connecting from an enclosure below)
1°, 3°, 5°, 10°
B
KARAIIi-RIGBAR (last enclosure with pullback)
–
B
KARAIIi-TILTBRACKET
all angles
A
none (last enclosure in the array)
–
A
b) Secure KARAIIi-LINK on the enclosure.
On the last enclosure of the array, secure KARAIIi-ENDLINK instead.
Do not secure the bottom screws.
Risk of crushing injury
Keep ngers away from underneath the enclosure.
5.
Secure the next Kara IIi on top of the array.
a) Link the enclosures at the front with rigging screws.
Adjusting the gap between stacked enclosures
Place a wedge or a lever between the two enclosures to align the rigging with the inserts.
Be careful not to scratch the paint.
Do not fully tighten the screws.
Kara IIi owner's manual (EN) version 2.0
79
Содержание Kara IIi
Страница 1: ...Kara IIi owner s manual EN ...
Страница 106: ...Corrective maintenance CONNECTOR PLATE HF DIAPHRAGM G03520 HF DRIVER G03521 106 Kara IIi owner s manual EN version 2 0 ...
Страница 130: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in 130 Kara IIi owner s manual EN version 2 0 ...
Страница 142: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...