Rigging procedures
b) Secure SB18IIi-ENDLINK on the enclosure.
Do not secure the top screws.
This step requires three operators.
Hold the enclosure at the bottom until the rigging plates are secured.
3.
Lift SB18 IIi and secure it to the slotted holes on KARAIIi-FIXBRACKET with rigging screws.
Apply a 5 N.m. torque.
5 N.m
4.
Remove the bottom rigging screws from SB18 IIi.
5.
Secure up to two Kara IIi under the array with KARAIIi-TILT. Refer to
SB18 IIi / Kara IIi array assembly
(p.55).
6.
Check that all the screws are secured and tightened.
What to do next
•
(p.94)
Kara IIi owner's manual (EN) version 2.0
75
Содержание Kara IIi
Страница 1: ...Kara IIi owner s manual EN ...
Страница 106: ...Corrective maintenance CONNECTOR PLATE HF DIAPHRAGM G03520 HF DRIVER G03521 106 Kara IIi owner s manual EN version 2 0 ...
Страница 130: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in 130 Kara IIi owner s manual EN version 2 0 ...
Страница 142: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...