Rigging procedures
Assembly
Procedure
1.
Secure KARAIIi-FIXBRACKET to the ceiling using M10 screws.
Fasteners for ceiling-mounting
Select screw length and anchors applicable to the ceiling properties.
Model the array in Soundvision and check the loads on rigging in the
Mechanics view
.
778 mm / 30.6 in
66
1
m
m
/ 2
6
in
Ø 12 mm / 0.5 in
2.
Prepare an SB18 IIi.
a) Remove the placeholder screws.
74
Kara IIi owner's manual (EN) version 2.0
Содержание Kara IIi
Страница 1: ...Kara IIi owner s manual EN ...
Страница 106: ...Corrective maintenance CONNECTOR PLATE HF DIAPHRAGM G03520 HF DRIVER G03521 106 Kara IIi owner s manual EN version 2 0 ...
Страница 130: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in 130 Kara IIi owner s manual EN version 2 0 ...
Страница 142: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...