background image

 

 

ARCS

®

II SYSTEM 

rigging manual 

 

VERSION 1.1 

 

 

 

 

ARCSII_RM_EN_1-1 

w w w . l - a c o u s t i c s . c o m  

4

 

 

SYMBOLS 

The following symbols are used in this document: 

 

 

DANGER  
This symbol indicates a potential risk of harm to an individual or damage to the product. It can also notify the 
user about instructions that must be strictly followed to ensure safe installation or operation of the product. 

 

 

 

OBLIGATION  
This symbol notifies the user about instructions that must be strictly followed to ensure proper installation or 

operation of the product. 

 

 

 

INFORMATION 
This symbol notifies the user about complementary information or optional instructions. 

 

 

 

WELCOME TO L-ACOUSTICS

®

 

Thank you for choosing the L-ACOUSTICS

®

 ARCS

®

II SYSTEM

 
This document contains essential information on rigging the system properly and safely. Carefully read this document in 

order to become familiar with these procedures. 

 

 

As  part  of  a  continuous  evolution  of  techniques  and  standards,  L-ACOUSTICS

®

  reserves  the  right  to 

change the specifications of its products and the content of its document without prior notice. 
 

Please check the L-ACOUSTICS

®

 web site on a regular basis to download latest updates for documents and software: 

www.l-acoustics.com. 

 
 

 

CONTENTS 

1

 

RIGGING SYSTEM 

5

 

1.1

 

Loudspeaker enclosures .............................................................................................................................................................. 5

 

1.2

 

Rigging elements .......................................................................................................................................................................... 5

 

1.3

 

Software application .................................................................................................................................................................... 5

 

1.4

 

Accessories .................................................................................................................................................................................. 5

 

2

 

MECHANICAL SAFETY 

7

 

2.1

 

Maximum configurations ............................................................................................................................................................. 7

 

2.2

 

Assessing mechanical safety ......................................................................................................................................................... 7

 

3

 

SYSTEM SET-UP 

8

 

3.1

 

Ground-stacking .......................................................................................................................................................................... 8

 

3.2

 

Flying ........................................................................................................................................................................................... 8

 

4

 

RIGGING PROCEDURES 

9

 

A.

 

Assembling an array with ARCOUPL bars .................................................................................................................................. 9

 

B.

 

Installing the BUMP3 rigging bar(s) ........................................................................................................................................... 11

 

C.

 

Installing the LIFTBAR rigging bar ............................................................................................................................................. 12

 

D.

 

Installing the ARCBUMP flying frame ........................................................................................................................................ 13

 

E.

 

Preparing the BUMP3/ARCOUPL assembly ............................................................................................................................. 15

 

 

Содержание ARCS II

Страница 1: ...ARCS II rigging manual EN...

Страница 2: ...o u s t i c s c o m 2 Document reference ARCSII_RM_EN_1 1 Distribution date March 21 2017 2017 L ACOUSTICS All rights reserved No part of this publication may be reproduced or transmitted in any form...

Страница 3: ...ct the maximum configurations and the recommended safety level For safety issue respect the maximum configurations outlined in this manual To check the conformity of any configuration in regards with...

Страница 4: ...rmation on rigging the system properly and safely Carefully read this document in order to become familiar with these procedures As part of a continuous evolution of techniques and standards L ACOUSTI...

Страница 5: ...shackles 12mm SB28 High power subwoofer enclosure 1 2 Rigging elements BUMP3 Bar for flying a horizontal array of 2 or 4 ARCS II provided with1 D schackle 18mm 2 pierced bolts 2 nuts and 2 pins LIFTB...

Страница 6: ...TEM rigging manual VERSION 1 1 ARCSII_RM_EN_1 1 w w w l a c o u s t i c s c o m 6 Main components involved in the rigging process of ARCS II SYSTEM BUMP3 ARCOUPL SB28 SOUNDVISION ARCBUMP ARCS II ARCSP...

Страница 7: ...nclosures within an array or to assess the safety of a specific array configuration Mechanical modeling with SOUNDVISION The working load applied to each linking point along with the corresponding saf...

Страница 8: ...to PROCEDURE A Stack an SB28 array Assemble the array on top of the SB28 array Refer to PROCEDURE A 3 2 Flying Horizontal Assemble the array under the motor location Refer to the PROCEDURE A Follow u...

Страница 9: ...fingers Attach adjacent enclosures by using ARCOUPL bars a Adjust the position of the ARCS II enclosures so that the rails are aligned b Remove one shackle at one end of each coupling bar c Slide ARC...

Страница 10: ...Enclosures placed at the rigging position b A safety pin being removed to detach the dolly board a Adjacent rigging rails aligned b The front shackle being removed from an ARCOUPL bar c An ARCOUPL bar...

Страница 11: ...PL assemblies into their respective location ie into the free top adjacent rails on the pre assembled array from the rear of the array c Secure the front end of each BUMP3 ARCOUPL assembly by reinstal...

Страница 12: ...ckle to the LIFTBAR by locking its pin through the LIFTBAR hole previously identified c Repeat this step on the other side of the LIFTBAR for the other BUMP3 Attach the 22mm shackle to the top hole on...

Страница 13: ...nstalling the 12mm shackles on both ends of all the ARCOUPL bars with a safety sling attached between all the adjacent shackles except for the bottom enclosure If some shackles are already attached to...

Страница 14: ...RCBUMP a A shackle is being removed from an ARCOUPL bar b The ARCOUPL bars are being slid in the rigging rails A shackle 12mm being reinstalled along with a safety sling The array secured with safety...

Страница 15: ...CS II assembly Remove both shackles from one ARCOUPL bar Align the holes of the ARCOUPL bar with the BUMP3 Secure both ends of the BUMP3 ARCOUPL assembly a Drive a pierced bolt into the holes at one o...

Страница 16: ...o l acoustics com www l acoustics com L Acoustics GmbH Steierm rker Str 3 5 70469 Stuttgart Germany 49 7 11 89660 323 L Acoustics Ltd PO Box Adler Shine Aston House Cornwall Avenue London N3 1LF Unite...

Отзывы: