background image

ARCSII_RM_EN_1.1 

w w w . l - a c o u s t i c s . c o m  

5

 

1

RIGGING SYSTEM 

The system approach developed by L-ACOUSTICS

®

 consists in providing packaged solutions for loudspeaker system in 

order  to  guarantee  the  highest  and  most  predictable  level  of  performance  at  any  step:  modeling,  installation,  and 

operation. An L-ACOUSTICS

®

 loudspeaker system is the set of components available to form any loudspeaker system 

based  on  one  of  the  full-range  loudspeaker  enclosure  afforded  by  L-ACOUSTICS

®

.  It  includes  enclosures,  rigging 

accessories, loudspeaker cables, amplified controllers, and software applications.  

The main components involved in the rigging process of the ARCS

®

II SYSTEM are the following: 

1.1

Loudspeaker enclosures 

ARCS

®

II 

Full range 2-way active enclosure, arrayable in a constant curvature line, 
provided with 2 ARCOUPL bars and 4 D-shackles Ø12mm 

SB28 

High power subwoofer enclosure 

1.2

Rigging elements 

BUMP3 

Bar for flying a horizontal array of 2 or 4 ARCS

®

II, 

provided with1 D-schackle Ø18mm, 2 pierced bolts, 2 nuts and 2 pins 

LIFTBAR 

Bar for flying a horizontal array of 1, 3, 5 or 6 ARCS

®

II enclosures, 

provided with2 D-schackle Ø18mm and 2  D-schackle Ø22mm, 

(to be used with 2 BUMP3) 

ARCBUMP 

Frame  for flying a  vertical array of up to 4 ARCS

®

II,  

provided with 2 ARCOUPL bars, 4 D-shackles Ø12mm, 2 D-schackle Ø18mm, 
6 safety slings 42mm and 6 safety slings 155mm.  

1.3

Software application 

SOUNDVISION  Proprietary 3D acoustical and mechanical modeling software 

1.4

Accessories 

ARCSPLA 

Removable  front  dolly  board  for  moving  the  enclosure  and  protecting  the  enclosure  front  grill 
during transportation and storage  

ARCSCOV 

Protective cover for transportation and storage 

Other ARCS

®

II SYSTEM components 

All the other components of the system are presented in the ARCS

®

II SYSTEM user manual, document 

intended to describe the operating modes and the loudspeaker connection. 

Содержание ARCS II

Страница 1: ...ARCS II rigging manual EN...

Страница 2: ...o u s t i c s c o m 2 Document reference ARCSII_RM_EN_1 1 Distribution date March 21 2017 2017 L ACOUSTICS All rights reserved No part of this publication may be reproduced or transmitted in any form...

Страница 3: ...ct the maximum configurations and the recommended safety level For safety issue respect the maximum configurations outlined in this manual To check the conformity of any configuration in regards with...

Страница 4: ...rmation on rigging the system properly and safely Carefully read this document in order to become familiar with these procedures As part of a continuous evolution of techniques and standards L ACOUSTI...

Страница 5: ...shackles 12mm SB28 High power subwoofer enclosure 1 2 Rigging elements BUMP3 Bar for flying a horizontal array of 2 or 4 ARCS II provided with1 D schackle 18mm 2 pierced bolts 2 nuts and 2 pins LIFTB...

Страница 6: ...TEM rigging manual VERSION 1 1 ARCSII_RM_EN_1 1 w w w l a c o u s t i c s c o m 6 Main components involved in the rigging process of ARCS II SYSTEM BUMP3 ARCOUPL SB28 SOUNDVISION ARCBUMP ARCS II ARCSP...

Страница 7: ...nclosures within an array or to assess the safety of a specific array configuration Mechanical modeling with SOUNDVISION The working load applied to each linking point along with the corresponding saf...

Страница 8: ...to PROCEDURE A Stack an SB28 array Assemble the array on top of the SB28 array Refer to PROCEDURE A 3 2 Flying Horizontal Assemble the array under the motor location Refer to the PROCEDURE A Follow u...

Страница 9: ...fingers Attach adjacent enclosures by using ARCOUPL bars a Adjust the position of the ARCS II enclosures so that the rails are aligned b Remove one shackle at one end of each coupling bar c Slide ARC...

Страница 10: ...Enclosures placed at the rigging position b A safety pin being removed to detach the dolly board a Adjacent rigging rails aligned b The front shackle being removed from an ARCOUPL bar c An ARCOUPL bar...

Страница 11: ...PL assemblies into their respective location ie into the free top adjacent rails on the pre assembled array from the rear of the array c Secure the front end of each BUMP3 ARCOUPL assembly by reinstal...

Страница 12: ...ckle to the LIFTBAR by locking its pin through the LIFTBAR hole previously identified c Repeat this step on the other side of the LIFTBAR for the other BUMP3 Attach the 22mm shackle to the top hole on...

Страница 13: ...nstalling the 12mm shackles on both ends of all the ARCOUPL bars with a safety sling attached between all the adjacent shackles except for the bottom enclosure If some shackles are already attached to...

Страница 14: ...RCBUMP a A shackle is being removed from an ARCOUPL bar b The ARCOUPL bars are being slid in the rigging rails A shackle 12mm being reinstalled along with a safety sling The array secured with safety...

Страница 15: ...CS II assembly Remove both shackles from one ARCOUPL bar Align the holes of the ARCOUPL bar with the BUMP3 Secure both ends of the BUMP3 ARCOUPL assembly a Drive a pierced bolt into the holes at one o...

Страница 16: ...o l acoustics com www l acoustics com L Acoustics GmbH Steierm rker Str 3 5 70469 Stuttgart Germany 49 7 11 89660 323 L Acoustics Ltd PO Box Adler Shine Aston House Cornwall Avenue London N3 1LF Unite...

Отзывы: