background image

 

 

ARCS

®

II SYSTEM 

rigging manual 

 

VERSION 1.1 

 

 

 

 

ARCSII_RM_EN_1-1 

w w w . l - a c o u s t i c s . c o m  

10

 

 

 

 PROCEDURE A : Assembling an enclosure array 

 

 

 

 

 

Enclosures placed at the rigging position 

A safety pin being removed to detach the dolly-board 

 

 

 

 

Adjacent rigging rails aligned 

The front shackle being removed from an ARCOUPL bar 

 

 
 

 

 
 

 

 

 

 

 

 

 

 

 

 

An ARCOUPL bar being slid from the rear of the array 

d

 

An ARCOUPL bar being secured (schackle Ø12mm) 

 

 

END

 

The ARCS

®

II assembly ready for the next procedure 

 

Содержание ARCS II

Страница 1: ...ARCS II rigging manual EN...

Страница 2: ...o u s t i c s c o m 2 Document reference ARCSII_RM_EN_1 1 Distribution date March 21 2017 2017 L ACOUSTICS All rights reserved No part of this publication may be reproduced or transmitted in any form...

Страница 3: ...ct the maximum configurations and the recommended safety level For safety issue respect the maximum configurations outlined in this manual To check the conformity of any configuration in regards with...

Страница 4: ...rmation on rigging the system properly and safely Carefully read this document in order to become familiar with these procedures As part of a continuous evolution of techniques and standards L ACOUSTI...

Страница 5: ...shackles 12mm SB28 High power subwoofer enclosure 1 2 Rigging elements BUMP3 Bar for flying a horizontal array of 2 or 4 ARCS II provided with1 D schackle 18mm 2 pierced bolts 2 nuts and 2 pins LIFTB...

Страница 6: ...TEM rigging manual VERSION 1 1 ARCSII_RM_EN_1 1 w w w l a c o u s t i c s c o m 6 Main components involved in the rigging process of ARCS II SYSTEM BUMP3 ARCOUPL SB28 SOUNDVISION ARCBUMP ARCS II ARCSP...

Страница 7: ...nclosures within an array or to assess the safety of a specific array configuration Mechanical modeling with SOUNDVISION The working load applied to each linking point along with the corresponding saf...

Страница 8: ...to PROCEDURE A Stack an SB28 array Assemble the array on top of the SB28 array Refer to PROCEDURE A 3 2 Flying Horizontal Assemble the array under the motor location Refer to the PROCEDURE A Follow u...

Страница 9: ...fingers Attach adjacent enclosures by using ARCOUPL bars a Adjust the position of the ARCS II enclosures so that the rails are aligned b Remove one shackle at one end of each coupling bar c Slide ARC...

Страница 10: ...Enclosures placed at the rigging position b A safety pin being removed to detach the dolly board a Adjacent rigging rails aligned b The front shackle being removed from an ARCOUPL bar c An ARCOUPL bar...

Страница 11: ...PL assemblies into their respective location ie into the free top adjacent rails on the pre assembled array from the rear of the array c Secure the front end of each BUMP3 ARCOUPL assembly by reinstal...

Страница 12: ...ckle to the LIFTBAR by locking its pin through the LIFTBAR hole previously identified c Repeat this step on the other side of the LIFTBAR for the other BUMP3 Attach the 22mm shackle to the top hole on...

Страница 13: ...nstalling the 12mm shackles on both ends of all the ARCOUPL bars with a safety sling attached between all the adjacent shackles except for the bottom enclosure If some shackles are already attached to...

Страница 14: ...RCBUMP a A shackle is being removed from an ARCOUPL bar b The ARCOUPL bars are being slid in the rigging rails A shackle 12mm being reinstalled along with a safety sling The array secured with safety...

Страница 15: ...CS II assembly Remove both shackles from one ARCOUPL bar Align the holes of the ARCOUPL bar with the BUMP3 Secure both ends of the BUMP3 ARCOUPL assembly a Drive a pierced bolt into the holes at one o...

Страница 16: ...o l acoustics com www l acoustics com L Acoustics GmbH Steierm rker Str 3 5 70469 Stuttgart Germany 49 7 11 89660 323 L Acoustics Ltd PO Box Adler Shine Aston House Cornwall Avenue London N3 1LF Unite...

Отзывы: