background image

 

 

 

 

 

 

ARCSII_RM_EN_1.1 

w w w . l - a c o u s t i c s . c o m  

7

 

 

2

 

MECHANICAL SAFETY 

2.1

 

Maximum configurations 

The ARCS

®

 II rigging system has been designed to comply with BGV-C1 (2012) and EN ISO 12100-1 (2004) when flying 

the following arrays: 

 

Horizontal 

Vertical 

With 1 BUMP3 

With 2 BUMP3  
and 1 LIFTBAR 

With ARCBUMP  

and 1 pick-up point 

With ARCBUMP  

and 2 pick-up point 

2 or 4 ARCS

®

 II  

1, 3, 5 or 6 ARCS

®

 II 

Up to 3 ARCS

®

 II 

Up to 4 ARCS

®

 II 

  

 

 

Mechanical safety of the shackles 

The D-shackles Ø12mm, Ø18mm and Ø22mm provided by L-ACOUSTICS

®

 have a working load limit (WLL) 

of respectively 630 kg, 1250 kg,  and 2000 kg with a 6:1 safety factor. These ratings are in accordance with 

BGV-C1  (2012)  recommendations  when  implementing  the  maximum  configurations  authorized  by                
L-ACOUSTICS

®

 

 

Mechanical safety of the rigging system 
Authorized configurations indicate the maximum number of enclosures which can be safely arrayed without 
the  need  for  SOUNDVISION  modeling.  For  more  enclosures,  model  the  system  in  SOUNDVISION  and 

check the Mechanical Data section for any stress warning or stability warning
 

 
 
2.2

 

Assessing mechanical safety 

In order to assess the actual safety of any array configuration before implementation, refer to the following warnings: 

 

 

Rated working load limit (WLL) is not enough 
The rated WLL is an indication of the element resistance to tensile stress. For complex mechanical systems 
such as loudspeaker arrays, WLLs cannot be used per se to determine the maximum number of enclosures 

within an array or to assess the safety of a specific array configuration. 

 

 

Mechanical modeling with SOUNDVISION  
The working load applied to each linking point, along with the corresponding safety factor, will depend on 
numerous variables linked to the composition of the array (type and number of enclosures, splay angles) and 

the implementation of the flying or stacking structure (number and location of flying points, site angle). This 
cannot be determined without the complex mechanical modeling and calculation offered by SOUNDVISION. 

 

 

Assessing the safety with SOUNDVISION 
The overall safety factor of a specific mechanical configuration always corresponds to the lowest safety factor 

among all the linking points. Always model the system configuration with the SOUNDVISION software and 
check  the  Mechanical  Data  section  to  identify  the  weakest  link  and  its  corresponding  working  load.  By 

default, a stress warning will appear when the mechanical safety goes below the recommended safety level. 

 

 

Safety of ground-stacked arrays in SOUNDVISION 
For  ground-stacked  arrays,  a  distinct  stability  warning  is  implemented  in  SOUNDVISION.  It  indicates  a 
tipping hazard  when  the  array  is not  secured  to  the  ground,  stage  or platform.  It  is user responsibility  to 

secure the array and to ignore this warning. 

 

 

Consideration must be given to unusual conditions 
SOUNDVISION  calculations  are  based  upon  usual  environmental  conditions.  A  higher  safety  factor  is 
recommended with factors such as extreme high or low temperatures, strong wind, prolonged exposition to 

salt water, etc. Always consult a rigging specialist to adopt safety practices adapted to such a situation. 

Содержание ARCS II

Страница 1: ...ARCS II rigging manual EN...

Страница 2: ...o u s t i c s c o m 2 Document reference ARCSII_RM_EN_1 1 Distribution date March 21 2017 2017 L ACOUSTICS All rights reserved No part of this publication may be reproduced or transmitted in any form...

Страница 3: ...ct the maximum configurations and the recommended safety level For safety issue respect the maximum configurations outlined in this manual To check the conformity of any configuration in regards with...

Страница 4: ...rmation on rigging the system properly and safely Carefully read this document in order to become familiar with these procedures As part of a continuous evolution of techniques and standards L ACOUSTI...

Страница 5: ...shackles 12mm SB28 High power subwoofer enclosure 1 2 Rigging elements BUMP3 Bar for flying a horizontal array of 2 or 4 ARCS II provided with1 D schackle 18mm 2 pierced bolts 2 nuts and 2 pins LIFTB...

Страница 6: ...TEM rigging manual VERSION 1 1 ARCSII_RM_EN_1 1 w w w l a c o u s t i c s c o m 6 Main components involved in the rigging process of ARCS II SYSTEM BUMP3 ARCOUPL SB28 SOUNDVISION ARCBUMP ARCS II ARCSP...

Страница 7: ...nclosures within an array or to assess the safety of a specific array configuration Mechanical modeling with SOUNDVISION The working load applied to each linking point along with the corresponding saf...

Страница 8: ...to PROCEDURE A Stack an SB28 array Assemble the array on top of the SB28 array Refer to PROCEDURE A 3 2 Flying Horizontal Assemble the array under the motor location Refer to the PROCEDURE A Follow u...

Страница 9: ...fingers Attach adjacent enclosures by using ARCOUPL bars a Adjust the position of the ARCS II enclosures so that the rails are aligned b Remove one shackle at one end of each coupling bar c Slide ARC...

Страница 10: ...Enclosures placed at the rigging position b A safety pin being removed to detach the dolly board a Adjacent rigging rails aligned b The front shackle being removed from an ARCOUPL bar c An ARCOUPL bar...

Страница 11: ...PL assemblies into their respective location ie into the free top adjacent rails on the pre assembled array from the rear of the array c Secure the front end of each BUMP3 ARCOUPL assembly by reinstal...

Страница 12: ...ckle to the LIFTBAR by locking its pin through the LIFTBAR hole previously identified c Repeat this step on the other side of the LIFTBAR for the other BUMP3 Attach the 22mm shackle to the top hole on...

Страница 13: ...nstalling the 12mm shackles on both ends of all the ARCOUPL bars with a safety sling attached between all the adjacent shackles except for the bottom enclosure If some shackles are already attached to...

Страница 14: ...RCBUMP a A shackle is being removed from an ARCOUPL bar b The ARCOUPL bars are being slid in the rigging rails A shackle 12mm being reinstalled along with a safety sling The array secured with safety...

Страница 15: ...CS II assembly Remove both shackles from one ARCOUPL bar Align the holes of the ARCOUPL bar with the BUMP3 Secure both ends of the BUMP3 ARCOUPL assembly a Drive a pierced bolt into the holes at one o...

Страница 16: ...o l acoustics com www l acoustics com L Acoustics GmbH Steierm rker Str 3 5 70469 Stuttgart Germany 49 7 11 89660 323 L Acoustics Ltd PO Box Adler Shine Aston House Cornwall Avenue London N3 1LF Unite...

Отзывы: