Rigging procedures
Assembly
Procedure
1.
Place the enclosures (logo on top) at the lifting location.
Optionally, prepare blocks of up to three enclosures. Refer to
Preparing a block of enclosures
(p.62).
2.
Connect the enclosures at the top.
Pull the enclosures together to align the rigging.
SHLAK!
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
A15 owner's manual (EN) version 1.2
59
Содержание A15 Focus
Страница 1: ...A15 owner s manual EN ...
Страница 36: ...Rigging system description 36 A15 owner s manual EN version 1 2 ...