Rigging procedures
Preparing a block of enclosures
About this task
This procedure is optional and requires two operators
A single operator must assemble the enclosures one by one. Refer to
(p.59).
Procedure
1.
Separate the array into blocks of two or three enclosures.
Connect each enclosure on both sides before adding the new one.
SHLAK!
This step requires two operators.
Make sure all unused rigging arms are in storage position.
2.
Position the enclosure blocks upright (logo on top) in two steps.
Tilt the enclosures on the rear.
Tilt the enclosures upright.
3.
(p.59).
62
A15 owner's manual (EN) version 1.2
Содержание A15 Focus
Страница 1: ...A15 owner s manual EN ...
Страница 36: ...Rigging system description 36 A15 owner s manual EN version 1 2 ...