3. PERIODIC MAINTENANCE
3-10
9.
Engine Oil
9.1.
Engine oil
recommendation
Use a premium quality 4-stroke motor oil to
ensure longer service life of your scooter.
Use only oils which are rated, SJ under the
API
service
classification.
The
recommended viscosity is SAE 15-40W. If
SAE 15-40W motor oil is not available,
select an alternative according to the right
chart.
Engine oil capacity:
At disassembly:
1.2 L (0.968 lmp qt, 1.166 US qt)
At change:
1.0L
9.2.
Engine oil level check
Check the engine oil level each day before
riding the scooter.
The level must be maintained between the
upper and lower level marks on the oil filler
cap/dipstick.
1. Start the engine and let it idle for a few
minutes.
2. Stop the engine and put the scooter on
its center stand on level ground.
3. After a few minutes, remove the oil filler
cap/dipstick, wipe it clean, and reinsert
the oil filler cap/dipstick without
screwing it in. Remove the oil filler
cap/dipstick. The oil level should be
between the upper and lower marks on
the oil filler cap/dipstick.
4. If required, add the specified oil up to
the upper level mark. Do not overfill.
5. Reinstall the oil filler cap/dipstick.
Check for oil leaks.
Let the engine and exhaust system
cool before working in those areas.
Содержание AHG1
Страница 3: ...1 Quick Reference 1 2 1 Engine Frame Serial Number Frame Serial Number Engine Serial Number ...
Страница 14: ...1 Quick Reference 1 13 8 General Troubleshooting Engine lacks power 8 1 ...
Страница 15: ...1 Quick Reference 1 14 ...
Страница 16: ...1 Quick Reference 1 15 Engine will not stat or is hard to start 8 2 ...
Страница 17: ...1 Quick Reference 1 16 Poor handling 8 3 ...
Страница 18: ...1 Quick Reference 1 17 Poor performance at high speed 8 4 ...
Страница 19: ...1 Quick Reference 1 18 Poor performance at low and idle speed 8 5 ...
Страница 20: ...2 External components Exhaust pipe 2 0 2 ...
Страница 21: ...2 External components Exhaust pipe 2 1 ...
Страница 57: ...4 LUBRICATION SYSTEM 4 1 Lubrication System ...
Страница 66: ...5 ENGINE 5 1 Engine 1 ENGINE REMOVAL INSTALLATION 4 1 1 Removal 4 1 2 Installation 6 ...
Страница 73: ...6 CYLINDER HEAD VALVE 6 2 1 SCHEMATIC DRAWING ...
Страница 87: ...7 CYLINDER PISTON 7 2 1 SCHEMATIC DRAWING ...
Страница 97: ...8 DRIVE DRIVEN PULLEYS 8 2 1 SCHEMATIC DRAWING ...
Страница 111: ...9 FINAL REDUCTION 9 2 1 SCHEMATIC DRAWING ...
Страница 122: ...10 A C GENERATOR STARTER CLUTCH Downtown 125i 10 2 SCHEMATIC DRAWING ...
Страница 130: ...11 Crank Case Crank Shaft 11 2 1 Schematic Drawing ...
Страница 134: ...11 Crank Case Crank Shaft 11 6 Remove the oil seal from the left crankcase ...
Страница 156: ...14 FRONT ASSEMBLY 14 2 1 SCHEMATIC DRAWING ...
Страница 157: ...14 FRONT ASSEMBLY 14 3 ...
Страница 176: ...15 REAR ASSEMBLY 15 2 1 SCHEMATIC DRAWING ...
Страница 196: ...18 STARTING SYSTEM 18 2 1 Starting System Layout Battery Start Relay Start Motor ...
Страница 224: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 5 Pre diagnosis Inspection Chart 1 ...
Страница 225: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 6 Pre diagnosis Inspection Chart 2 ...