10. A.C. GENERATOR & STARTER CLUTCH
Downtown 125i
10-3
SERVICE INFORMATION
GENERAL INSTRUCTIONS
All servicing operations and inspections in this section can be made with the engine
installed.
Drain the coolant before removing the right crankcase cover.
Be careful not to drain the coolant when the engine temperature is high. (Perform
this operation when the engine is cold.)
Drain the coolant into a clean container.
Drain the engine oil into a clean container before removing the right crankcase
cover.
When the right crankcase cover is installed, fill with the recommended engine oil
and coolant. Then, bleed air from the water jacket.
Refer to chapter 17 for A.C. generator inspection.
SPECIFICATIONS
Engine Oil
SAE 15W/40#
API-SJ Above
Oil Capacity At Change
1.2 L
Coolant
Distilled Water + Coolant Concentrate
Coolant Capacity
0.87 L
SPECIAL TOOLS
Flywheel Puller
A120E00003
Flywheel Holder
A120E00021
TORQUE VALUES
Flywheel Nut
5.0~6.0 kgf-m
TROUBLESHOOTING
Refer to page chapter 17 for A.C. generator troubleshooting.
Starter motor rotates but engine does not start
Faulty starter clutch
Starter motor rotates reversely
Weak battery
Содержание AHG1
Страница 3: ...1 Quick Reference 1 2 1 Engine Frame Serial Number Frame Serial Number Engine Serial Number ...
Страница 14: ...1 Quick Reference 1 13 8 General Troubleshooting Engine lacks power 8 1 ...
Страница 15: ...1 Quick Reference 1 14 ...
Страница 16: ...1 Quick Reference 1 15 Engine will not stat or is hard to start 8 2 ...
Страница 17: ...1 Quick Reference 1 16 Poor handling 8 3 ...
Страница 18: ...1 Quick Reference 1 17 Poor performance at high speed 8 4 ...
Страница 19: ...1 Quick Reference 1 18 Poor performance at low and idle speed 8 5 ...
Страница 20: ...2 External components Exhaust pipe 2 0 2 ...
Страница 21: ...2 External components Exhaust pipe 2 1 ...
Страница 57: ...4 LUBRICATION SYSTEM 4 1 Lubrication System ...
Страница 66: ...5 ENGINE 5 1 Engine 1 ENGINE REMOVAL INSTALLATION 4 1 1 Removal 4 1 2 Installation 6 ...
Страница 73: ...6 CYLINDER HEAD VALVE 6 2 1 SCHEMATIC DRAWING ...
Страница 87: ...7 CYLINDER PISTON 7 2 1 SCHEMATIC DRAWING ...
Страница 97: ...8 DRIVE DRIVEN PULLEYS 8 2 1 SCHEMATIC DRAWING ...
Страница 111: ...9 FINAL REDUCTION 9 2 1 SCHEMATIC DRAWING ...
Страница 122: ...10 A C GENERATOR STARTER CLUTCH Downtown 125i 10 2 SCHEMATIC DRAWING ...
Страница 130: ...11 Crank Case Crank Shaft 11 2 1 Schematic Drawing ...
Страница 134: ...11 Crank Case Crank Shaft 11 6 Remove the oil seal from the left crankcase ...
Страница 156: ...14 FRONT ASSEMBLY 14 2 1 SCHEMATIC DRAWING ...
Страница 157: ...14 FRONT ASSEMBLY 14 3 ...
Страница 176: ...15 REAR ASSEMBLY 15 2 1 SCHEMATIC DRAWING ...
Страница 196: ...18 STARTING SYSTEM 18 2 1 Starting System Layout Battery Start Relay Start Motor ...
Страница 224: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 5 Pre diagnosis Inspection Chart 1 ...
Страница 225: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 6 Pre diagnosis Inspection Chart 2 ...