![KYMCO AHG1 Скачать руководство пользователя страница 190](http://html1.mh-extra.com/html/kymco/ahg1/ahg1_maintenance-manuallines_2014864190.webp)
16. BATTERY/CHARGING SYSTEM
16-5
3.
Battery
3.1.
Removal
The battery is in the front part of the vehicle.
1. Remove the wind screen and front
cover.
2. Remove the screws.
3. Remove the battery cover.
4. Disconnect the negative cable from the
battery first, and then disconnect the
positive cable.
5. Remove the battery from the battery
box.
3.2.
Installation
Install in the reverse order of the removal.
When install the battery, first
connect the positive cable and then
negative cable to avoid short
circuit.
3.3.
Voltage Inspection
Measure the battery voltage using a
commercially available digital multimeter.
Voltage :
Fully charged: 13
-
13.2 V
Under charged: below 12.3 V
Negative cable
Positive cable
Negative
cable
Positive cable
Содержание AHG1
Страница 3: ...1 Quick Reference 1 2 1 Engine Frame Serial Number Frame Serial Number Engine Serial Number ...
Страница 14: ...1 Quick Reference 1 13 8 General Troubleshooting Engine lacks power 8 1 ...
Страница 15: ...1 Quick Reference 1 14 ...
Страница 16: ...1 Quick Reference 1 15 Engine will not stat or is hard to start 8 2 ...
Страница 17: ...1 Quick Reference 1 16 Poor handling 8 3 ...
Страница 18: ...1 Quick Reference 1 17 Poor performance at high speed 8 4 ...
Страница 19: ...1 Quick Reference 1 18 Poor performance at low and idle speed 8 5 ...
Страница 20: ...2 External components Exhaust pipe 2 0 2 ...
Страница 21: ...2 External components Exhaust pipe 2 1 ...
Страница 57: ...4 LUBRICATION SYSTEM 4 1 Lubrication System ...
Страница 66: ...5 ENGINE 5 1 Engine 1 ENGINE REMOVAL INSTALLATION 4 1 1 Removal 4 1 2 Installation 6 ...
Страница 73: ...6 CYLINDER HEAD VALVE 6 2 1 SCHEMATIC DRAWING ...
Страница 87: ...7 CYLINDER PISTON 7 2 1 SCHEMATIC DRAWING ...
Страница 97: ...8 DRIVE DRIVEN PULLEYS 8 2 1 SCHEMATIC DRAWING ...
Страница 111: ...9 FINAL REDUCTION 9 2 1 SCHEMATIC DRAWING ...
Страница 122: ...10 A C GENERATOR STARTER CLUTCH Downtown 125i 10 2 SCHEMATIC DRAWING ...
Страница 130: ...11 Crank Case Crank Shaft 11 2 1 Schematic Drawing ...
Страница 134: ...11 Crank Case Crank Shaft 11 6 Remove the oil seal from the left crankcase ...
Страница 156: ...14 FRONT ASSEMBLY 14 2 1 SCHEMATIC DRAWING ...
Страница 157: ...14 FRONT ASSEMBLY 14 3 ...
Страница 176: ...15 REAR ASSEMBLY 15 2 1 SCHEMATIC DRAWING ...
Страница 196: ...18 STARTING SYSTEM 18 2 1 Starting System Layout Battery Start Relay Start Motor ...
Страница 224: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 5 Pre diagnosis Inspection Chart 1 ...
Страница 225: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 6 Pre diagnosis Inspection Chart 2 ...