![KYMCO AHG1 Скачать руководство пользователя страница 192](http://html1.mh-extra.com/html/kymco/ahg1/ahg1_maintenance-manuallines_2014864192.webp)
16. BATTERY/CHARGING SYSTEM
16-7
4.
Charging System Inspection
4.1.
Charging Voltage
Perform this inspection after the
battery is fully charged.
Start the engine and warm it up to the
operating temperature; stop the engine.
Connect the multimeter between the
positive and negative terminals of the
battery.
To prevent short, make absolutely certain
which are the positive and negative
terminals or cable.
With the headlight on and turned to the high
beam position, restart the engine.
Measure the voltage on the multimeter
when the engine runs at 5000 min (rpm).
Standard:
14~15V/ Under 0.5A (Under 5000rpm)
Inspect the rectifier/regulator if the voltage
is not in the standard.
Do not disconnect the battery or
any cable in the charging system
without first switching off the
ignition switch. Failure to follow this
precaution can damage the tester or
electrical components.
Negative terminal
Positive terminal
Содержание AHG1
Страница 3: ...1 Quick Reference 1 2 1 Engine Frame Serial Number Frame Serial Number Engine Serial Number ...
Страница 14: ...1 Quick Reference 1 13 8 General Troubleshooting Engine lacks power 8 1 ...
Страница 15: ...1 Quick Reference 1 14 ...
Страница 16: ...1 Quick Reference 1 15 Engine will not stat or is hard to start 8 2 ...
Страница 17: ...1 Quick Reference 1 16 Poor handling 8 3 ...
Страница 18: ...1 Quick Reference 1 17 Poor performance at high speed 8 4 ...
Страница 19: ...1 Quick Reference 1 18 Poor performance at low and idle speed 8 5 ...
Страница 20: ...2 External components Exhaust pipe 2 0 2 ...
Страница 21: ...2 External components Exhaust pipe 2 1 ...
Страница 57: ...4 LUBRICATION SYSTEM 4 1 Lubrication System ...
Страница 66: ...5 ENGINE 5 1 Engine 1 ENGINE REMOVAL INSTALLATION 4 1 1 Removal 4 1 2 Installation 6 ...
Страница 73: ...6 CYLINDER HEAD VALVE 6 2 1 SCHEMATIC DRAWING ...
Страница 87: ...7 CYLINDER PISTON 7 2 1 SCHEMATIC DRAWING ...
Страница 97: ...8 DRIVE DRIVEN PULLEYS 8 2 1 SCHEMATIC DRAWING ...
Страница 111: ...9 FINAL REDUCTION 9 2 1 SCHEMATIC DRAWING ...
Страница 122: ...10 A C GENERATOR STARTER CLUTCH Downtown 125i 10 2 SCHEMATIC DRAWING ...
Страница 130: ...11 Crank Case Crank Shaft 11 2 1 Schematic Drawing ...
Страница 134: ...11 Crank Case Crank Shaft 11 6 Remove the oil seal from the left crankcase ...
Страница 156: ...14 FRONT ASSEMBLY 14 2 1 SCHEMATIC DRAWING ...
Страница 157: ...14 FRONT ASSEMBLY 14 3 ...
Страница 176: ...15 REAR ASSEMBLY 15 2 1 SCHEMATIC DRAWING ...
Страница 196: ...18 STARTING SYSTEM 18 2 1 Starting System Layout Battery Start Relay Start Motor ...
Страница 224: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 5 Pre diagnosis Inspection Chart 1 ...
Страница 225: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 6 Pre diagnosis Inspection Chart 2 ...