Delivery and assembly
53
Passage of hoses:
At the hopper outlet, connect the hose n°1 to the spreader.
Pass hoses n°2,3 and 4 through the hose support (A).
At the hose support exit, group the 3 hoses using clamping rings.
Group the 3 hoses in position E and fix them to the chain using
clamping rings.
Connect the hose n°2 to the spreader.
Group hoses n°3 and 4 in position F and attach them to the chain
using clamping rings.
Connect the hose n°3 to the spreader.
Fix hose n°4 to the oblong hole in the exterior roller arm (G) using
a clamping ring.
Connect the hose n°4 to the spreader.
G
F
Содержание a-drill
Страница 80: ...Seed drill adjustment 80 Sowing tables ...
Страница 81: ...Seed drill adjustment 81 ...
Страница 82: ...Seed drill adjustment 82 ...
Страница 83: ...Seed drill adjustment 83 ...
Страница 84: ...Seed drill adjustment 84 ...
Страница 85: ...Seed drill adjustment 85 ...
Страница 89: ...Filling the seedbox 89 Qualidisc and Qualidisc Farmer Unfold the machine Fill in the seedbox ...
Страница 95: ...Adjustments 95 Main display Organisation of the menus ...