Delivery and assembly
31
Passage of hoses
Order of distribution for
seed hoses
The seed flow hoses leave the hopper to the front when it is mounted
on a rigid mounted disc cultivator.
Cultivators 3m00 (
9’10”
) and 3m50 (
11’6”
)
Ensure you respect the seed outlet numbers compared to the
spreader positions.
Group the 4 hoses (position B) so that they form a square.
Put a clamping ring around the 4 hoses.
Fix them to the machine stay (A).
Fold the hoses ensuring that their curve is as natural as possible.
Pass hoses number 1, 2 and 3 in a new clamping ring (position C).
Attach this clamping ring in the furthest front hole of the drilled plate
of the machine (D).
Attach the hose number 4 to the upper part of the platform (E).
Cross the two hoses number 4 before connecting them to the
spreaders.
Check in the upper and lower positions that there are no blocking,
tension or crushing points for the hoses.
A
B
C
D
E
Hose 1
Hose 2
Hose 3
Hose 4
Содержание a-drill
Страница 80: ...Seed drill adjustment 80 Sowing tables ...
Страница 81: ...Seed drill adjustment 81 ...
Страница 82: ...Seed drill adjustment 82 ...
Страница 83: ...Seed drill adjustment 83 ...
Страница 84: ...Seed drill adjustment 84 ...
Страница 85: ...Seed drill adjustment 85 ...
Страница 89: ...Filling the seedbox 89 Qualidisc and Qualidisc Farmer Unfold the machine Fill in the seedbox ...
Страница 95: ...Adjustments 95 Main display Organisation of the menus ...