Lockout Tagout Guidelines
1-12
990-APEX Service Manual
Lockout Tagout Guidelines
Follow these Lockout Tagout guidelines,
• Place a tag on all padlocks. On the tag, each operator must put their own name and
date.
(These locks are only to be removed by the person who signs the tag)
• If more than one person is working on the machine, each additional person places a
lock and tag on each disconnect.
• Only each operator may remove their own lock and tag.
Important:
When many people are all working on the same machine you will need a
multiple lockout device, such as the one shown here.
Follow the P-R-O-P-E-R lockout rule of thumb.
P......
Process shutdown
R ......
Recognize energy type (electrical, pneumatic, mechanical, etc.)
O......
OFF! Shut off all power sources and isolating devices
P......
Place lock and tag
E......
ENERGY: Release stored energy to a zero-energy state
R ......
Recheck controls and test to ensure they are in the “OFF” state
Содержание 990-APEX
Страница 10: ...990 APEX Service Manual Table of Contents ...
Страница 31: ...Kval Return and Warranty Policy 1 21 990 APEX Service Manual Page Intentionally Left Blank ...
Страница 97: ......
Страница 98: ...Notes ...
Страница 99: ...Notes ...