VHD5 Rigging Manual ·
Bottom VHD8.10 Cabinet
2. Fly the system up to a level where the last two VHD8.10
cabinets can be rolled into position, directly under
the VHD5.0 cabinet.
4. Remove the push pins at the top of the third VHD8.10 and the bottom of the VHD5.0. Then rotate the silver knob on
both sides of the VHD8.10 which will allow the rigging arms to raise up in to the bottom VH5.0. Once in position replace
the push pins on the VHD8.10 and the adjacent VHD5.0 into the respective locking point no’s 1 and 2.
5. Remove the pushpins from both lower sides of the third VHD8.10 cabinet, where it connects to the bottom VHD8.10
cabinet, and disconnect the two cabinets by rotating the rigging bars on the bottom VHD8.10 cabinet into the transport
position. Replace the pushpins.
6. Find the tag on the tensioning chain, near the bottom, which corresponds to using one VHD5.0 with three VHD8.10’s per
side and attach that point to the L-Track on the third VHD8.10 cabinet.
7. By raising the flybar slightly you will be able to wheel out the remaining single VHD8.10 cabinet, which can then be moved
to the other side of the stage for the second system hang.
3. Carefully land the VHD5.0 cabinet on to the top
of the 2 VHD8.10 cabinets, ensuring that the feet
are aligned correctly with the VHD8.10 cabinets.
Bottom VHD8.10 Cabinet
1. Remove the transport cover from the last pair of VHD8.10 cabinets.
8. Land the system on the ground, so that the tensioning chain
can be connected to the fly track on the bottom VHD8.10
cabinet, with the Double Stud L Track clip which has a marked
with a tag near the bottom of the tensioning chain.
Find the tag on the chain which corresponds to using
one
VHD5.0 with three VHD8.10’s per side
and attach that point
to the L-Track on the bottom VHD8.10 cabinet.
9. Take the final Blue LK connector, and insert it into the third
VHD8.10 cabinet.
VHD5 R
igging M
anual ·
Top 2
VHD8.10 C
abinets
16