INSTALLATION
Unpack the crimper and verify you have received the following items:
KH-60 Crimper
Reservoir Vent
Ram Pusher
Bent Tube Pusher Donut
Operators Manual
Moly Grade Anti-Seize 3 oz. Tube
Follow these steps before using the crimper for the first time:
1.
Locate a sturdy bench or worktable at a suitable height for your needs that’s in a well-lighted
area and within 7 feet of a 110 Volt AC outlet.
2.
Lift the crimper onto the located worktable. Due to the weight of the crimper, Kurt Hydraulics
recommends lifting the crimper by mechanical means at the top of the single handle. When
lifted by this handle, the crimper will be balanced. Place the front edge of the sheet metal
crimper base flush to the front of the worktable. The crimper is balanced in this position but
Kurt Hydraulics recommends using the four (4) mounting holes provide in the crimper base to
securely fasten to the worktable.
3.
Plug-in power cord to a grounded 110 Volt AC outlet. The use of extension cords is not
recommended.
4.
Remove the threaded shipping plug and replaced with the supplied vent.