- 13 -
- Install belts (G) (photo 3) on pulleys and tension
them by tightening screw (H) (photo 3 A).
- Belt tension is correct if deflection does not exceed
10 mm (2/5") when belt is pressed upon with a force
of 3.5 kg (8 lbs) at mid distance between pulleys.
- When correct tension has been obtained, tighten
lock nut (J) (photo 3 A).
- Attach outer belt shield (X) with 3 washers and 3 cap
nuts (I) (photo 4).
- Assemble closing plate and outer belt shield with
one self-locking screw (K) (M 8 x 16) (photo 4).
4. Frame pipe and lift bracket assembly
- After cleaning attach frame pipe (L) (photo 5) to bevel
gearbox with 4 screws (M) (M 16 x 40). (Torque : 21
daNm / 155 ft.lbs).
All manuals and user guides at all-guides.com