- 18 -
12. A s s e m b l i n g o f c e n t r a l s w a t h
screen
Mount swath screen support (D) to the central gearbox
(E) with 4 hexagon bolts (M 12 x 25) and 2 plates which
must be installed under the bolt heads (photo 26).
Connect crank (F) to crossbar (H) using support (G),
2 hexagon bolts (I) (M 12 x 18) and 2 self-locking nuts
(M 12). Make sure the end portion of the crank with
drive pin (J) is housed by the screen tube as shown in
photo 26.
Assemble the SMV mounting bracket (S) on support
(G) with 2 self-locking screws (T) (M 8 x 12) and 2 self-
locking nuts (M 8) (photo 26).
B. MACHINES SHIPPED “PREASSEMBLED”
The unloading operation of a GA 7301 that has been shipped in a “preassembled” form requires a lift mechanism
(crane, hoist etc.) with a minimum capacity of 2 tons.
Connect lifting hooks (K) to the 4 anchorage points (L) located on the main carrying frame (M) and to the
hydraulic cylinder mounting yokes (N) (photos A and B).
The 4 anchorage points (L) are indicated by the opposite decal.
Keep all persons away from the danger zone whilst unloading the machine.
26
Содержание GA 7301
Страница 1: ...ASSEMBLY OPERATORS MANUAL GA 7301 GYRORAKE N 95304 D GB 09 2003...
Страница 11: ...9 3 4 5 7 6...