- 25 -
TRANSPORT
To fold the machine into transport position, proceed as
follows :
- Unlock the foldable guards (Z) using handles (K) and
raise them in transport position (see arrow, photo
41).
- Return handles (K) in their storage location (C)
(photo 41).
- Disconnect the 3 outside tine arms (E) of each rotor
and place them into the two racks (R) (photo 41 A).
Secure tine arms with linch pins (S) (photo 41 A).
- Pull the control cords (I) (photo 9A) and activate the
tractor hydraulics to lift the 2 rotors until they lock
automatically into the transport position (photo 42).
- Fold back side guards (H) and lock them in place
with linch pin (J) (photo 43).
- Wind up swath screen (C) (photo 43) (also see page
23).
- Check that plug (H) of the light and signal system is
properly connected (see photo 27 on page 18) and
ensure that all signal lights are functioning correctly.
Wait until the rotating elements have
come to a complete stop and keep all
persons away from the vicinity of the
machine before pivoting the rotors
into work or transport position.
When working on slopes, turn the
whole unit, tractor-machine, in the
direction of the slope before
unfolding the rotors.
The parking stand must always be
lifted when in transport and in work.
Never engage the rotor drive when
the machine is in the transport po-
sition.
Do not tow the GA 7301 at a speed
exceeding the limits in force in the
country in which the machine is
transported. If in doubt about the legal
speed limit, consult a legal adviser.
42
Содержание GA 7301
Страница 1: ...ASSEMBLY OPERATORS MANUAL GA 7301 GYRORAKE N 95304 D GB 09 2003...
Страница 11: ...9 3 4 5 7 6...