- 19 -
Use the 2 textile slings (O and P) (photo C), working
out their length so that the machine is lifted up
horizontally (minimum capacity of 1500 kg on both
strands of each sling when these slings are of the
length indicated in photo C).
Before starting to assemble the unit, carefully remove
braces (Q) and (R) as well as all connecting wires
(photo D) which will no longer be of use.
All loose components (tine arms, tines, PTO shafts,
signalling elements and hardware bags) are packed
onto a separate pallet.
All fitting instructions for GA 7301 gyrorakes shipped in crates also apply to the
“preassembled” units.
D
Содержание GA 7301
Страница 1: ...ASSEMBLY OPERATORS MANUAL GA 7301 GYRORAKE N 95304 D GB 09 2003...
Страница 11: ...9 3 4 5 7 6...