RT120Q Operator’s Manual
Drive - 87
Shut Down
Shut Down
1.
When job is complete, drive unit to level ground.
2.
Move ground drive control to neutral.
3.
Set parking brake and verify parking brake indicator is on.
4.
Lower all unstowed attachments to ground.
5.
Run engine at low throttle for three minutes to cool.
6.
Turn ignition switch to STOP. If leaving machine unattended, remove key.
7.
For maintenance or long-term storage, turn battery disconnect switch to disconnect position.
NOTICE:
To avoid equipment damage, wait two minutes after turning engine off before
disconnecting battery.
Содержание RT120Q
Страница 1: ...RT120Q Operator s Manual Issue 2 0 Original Instruction 053 2634 ...
Страница 7: ...Overview 6 RT120Q Operator s Manual About This Manual ...
Страница 75: ...Operation Overview 74 RT120Q Operator s Manual Leaving Jobsite ...
Страница 83: ...Prepare 82 RT120Q Operator s Manual Check Supplies and Prepare Equipment ...
Страница 89: ...Drive 88 RT120Q Operator s Manual Shut Down ...
Страница 101: ...Transport 100 RT120Q Operator s Manual Retrieve ...
Страница 102: ...RT120Q Operator s Manual Trench 101 Trench Chapter Contents Set Up 102 Operate 104 Finish Job 106 ...
Страница 115: ...Plow 114 RT120Q Operator s Manual Finish Job ...
Страница 127: ...Backhoe 126 RT120Q Operator s Manual Finish Job ...
Страница 140: ...RT120Q Operator s Manual Saw 139 Saw Chapter Contents Set Up 140 Operate 141 Finish Job 143 ...
Страница 145: ...Saw 144 RT120Q Operator s Manual Finish Job ...
Страница 193: ...Service 192 RT120Q Operator s Manual As Needed ...
Страница 213: ...Specifications 212 RT120Q Operator s Manual Declaration of Conformity Information ...
Страница 216: ......
Страница 217: ......
Страница 218: ...RT120Q Operator s Manual Service Record 217 Service Record Service Performed Date Hours ...
Страница 219: ...Service Record 218 RT120Q Operator s Manual Service Performed Date Hours ...