
RT120Q Operator’s Manual
Drill - 129
Set Up
Dig Target Trench
1.
Select a completion point for the bore.
2.
Dig a target trench (2)
across
the intended completion point.
Install Drill String
1.
Assemble at least 20’ (6 m), but not more than 30’ (9 m), of drill rod sections.
2.
Install drill bit to the cutting end of the drill string.
3.
Put drill string in approach trench and align with intended bore path.
4.
Start engine and set to low throttle. See “Start Unit” on page 84.
5.
Lower boom in parallel position to ground.
6.
Move machine toward approach trench. See “Drive” on page 85.
7.
Shut down engine. See “Shut Down” on page 87.
8.
Install drilling attachment to backfill blade.
9.
Connect hydraulic lines.
IMPORTANT:
Ensure that target trench is:
•
deep enough for drill bit to enter slightly above the trench floor, and
•
long enough to allow for drift of unguided drill string. Accuracy of bore decreases with length
and varies with soil conditions.
NOTICE:
Incorrect installation can cause rod sections to bend.
•
Ensure more than half of drill string length is inside trench.
•
If necessary, remove rod sections or increase length of trench.
Содержание RT120Q
Страница 1: ...RT120Q Operator s Manual Issue 2 0 Original Instruction 053 2634 ...
Страница 7: ...Overview 6 RT120Q Operator s Manual About This Manual ...
Страница 75: ...Operation Overview 74 RT120Q Operator s Manual Leaving Jobsite ...
Страница 83: ...Prepare 82 RT120Q Operator s Manual Check Supplies and Prepare Equipment ...
Страница 89: ...Drive 88 RT120Q Operator s Manual Shut Down ...
Страница 101: ...Transport 100 RT120Q Operator s Manual Retrieve ...
Страница 102: ...RT120Q Operator s Manual Trench 101 Trench Chapter Contents Set Up 102 Operate 104 Finish Job 106 ...
Страница 115: ...Plow 114 RT120Q Operator s Manual Finish Job ...
Страница 127: ...Backhoe 126 RT120Q Operator s Manual Finish Job ...
Страница 140: ...RT120Q Operator s Manual Saw 139 Saw Chapter Contents Set Up 140 Operate 141 Finish Job 143 ...
Страница 145: ...Saw 144 RT120Q Operator s Manual Finish Job ...
Страница 193: ...Service 192 RT120Q Operator s Manual As Needed ...
Страница 213: ...Specifications 212 RT120Q Operator s Manual Declaration of Conformity Information ...
Страница 216: ......
Страница 217: ......
Страница 218: ...RT120Q Operator s Manual Service Record 217 Service Record Service Performed Date Hours ...
Страница 219: ...Service Record 218 RT120Q Operator s Manual Service Performed Date Hours ...