
RT105M Operator’s Manual
Service - 135
10 Hour
Check Digging Chain Tension
Check digging chain tension every 10 hours.
Sprocket Boom
Tension is correct when 2” (50 mm) of slide and
stop (3) are exposed. Adjust tension with boom
horizontal by tightening or loosening adjustment
screws (2) and jam nuts (1).
Roller Boom with Adjusting Screw
With boom horizontal, measure distance from
bottom of boom to chain (3). When properly
adjusted, distance should be 1.5-2” (40-50 mm).
Adjust tension by tightening or loosening
adjustment screw (1) and jam nut (2).
Содержание RT105M
Страница 1: ...RT105M Operator s Manual Issue 2 0 Original Instruction 053 2943...
Страница 7: ...Overview 6 RT105M Operator s Manual About This Manual...
Страница 25: ...Safety 24 RT105M Operator s Manual Attachment Safety Alerts...
Страница 61: ...Controls 60 RT105M Operator s Manual Battery Disconnect...
Страница 65: ...Operation Overview 64 RT105M Operator s Manual Leaving Jobsite...
Страница 73: ...Prepare 72 RT105M Operator s Manual Check Supplies and Prepare Equipment...
Страница 79: ...Drive 78 RT105M Operator s Manual Shut Down...
Страница 87: ...Transport 86 RT105M Operator s Manual Retrieve...
Страница 95: ...Backhoe 94 RT105M Operator s Manual Finish Job...
Страница 96: ...RT105M Operator s Manual Trench 95 Trench Chapter Contents Set Up 96 Operate 98 Finish Job 100...
Страница 165: ...Service 164 RT105M Operator s Manual As Needed...
Страница 180: ......
Страница 181: ......
Страница 182: ...RT105M Operator s Manual Service Record 223 Service Record Service Performed Date Hours...
Страница 183: ...Service Record 224 RT105M Operator s Manual Service Performed Date Hours...