12 SERVICE WORK ON THE CHASSIS
90
E00841-10
Main work
–
Check throttle cable routing.
The throttle cable must be routed behind the handle-
bar, on the right of the frame, and to the carburetor. The
throttle cable must be secured behind the fuel tank con-
tact area rubber band.
» If the throttle cable routing is not as specified:
–
Correct throttle cable routing.
Finishing work
–
Install the fuel tank.
–
Mount the seat. (
12.42
Checking the rubber grip
401197-01
–
Check the rubber grips on the handlebar for damage, wear,
and looseness.
Info
The rubber grips are vulcanized onto a sleeve on the
left and onto the handle tube of the throttle grip on the
right. The left sleeve is clamped onto the handlebar.
The rubber grip can only be replaced with the sleeve or
the throttle tube.
» If a rubber grip is damaged or worn:
–
Change the rubber grip.
K00547-10
–
Check that screw
1
is firmly seated.
Guideline
Screw, fixed
grip
M4
5 Nm (3.7 lbf ft)
Loctite
®
243™
Diamond
A
must be located at the top.
Содержание F7360R6
Страница 1: ...OWNER S MANUAL 2018 250 EXC 250 XC W 300 EXC 300 XC W 300 XC W Six Days Art no 3213644en...
Страница 2: ......
Страница 154: ...22 TECHNICAL DATA 152 Nut primary gear M18LHx1 5 150 Nm 110 6 lbf ft Loctite 648...
Страница 178: ...3213644en 3213644en 03 2017 KTM Sportmotorcycle GmbH 5230 Mattighofen Austria http www ktm com Photo Mitterbauer KTM...