
12 SERVICE WORK ON THE CHASSIS
73
–
Check the steering head bearing and change if neces-
sary.
Finishing work
–
Remove the motorcycle from the lift stand. (
12.14
Adjusting the steering head bearing play
Preparatory work
–
Raise the motorcycle with a lift stand. (
V00339-10
Main work
(All standard EXC/XC-W models)
–
Loosen screws
1
and
2
.
–
Loosen and retighten screw
3
.
Guideline
Screw, top steering
head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple
clamp to avoid stresses.
–
Tighten screws
1
.
Guideline
Screw, top triple
clamp
M8
20 Nm
(14.8 lbf ft)
–
Tighten screw
2
.
Guideline
Screw, top steering
stem
M8
20 Nm
(14.8 lbf ft)
E00833-10
(All Six Days models)
–
Loosen screws
1
. Remove screw
2
.
–
Loosen and retighten screw
3
.
Guideline
Screw, top steering
head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple
clamp to avoid stresses.
–
Tighten screws
1
.
Guideline
Screw, top triple
clamp
M8
17 Nm
(12.5 lbf ft)
–
Mount and tighten screw
2
.
Guideline
Screw, top
steering stem
M8
17 Nm (12.5 lbf ft)
Loctite
®
243™
Finishing work
–
Check the play of the steering head bearing. (
–
Remove the motorcycle from the lift stand. (
Содержание F7360R6
Страница 1: ...OWNER S MANUAL 2018 250 EXC 250 XC W 300 EXC 300 XC W 300 XC W Six Days Art no 3213644en...
Страница 2: ......
Страница 154: ...22 TECHNICAL DATA 152 Nut primary gear M18LHx1 5 150 Nm 110 6 lbf ft Loctite 648...
Страница 178: ...3213644en 3213644en 03 2017 KTM Sportmotorcycle GmbH 5230 Mattighofen Austria http www ktm com Photo Mitterbauer KTM...