Extending the Guide Rail (Optional)

If the required installation depth of the guide rail exceeds the

standard length of 6m, the guide rail can be extended at the site

by welding on a length of square rail (100x100x5 to DIN 59411,

DIN 2395 or equivalent standard). The square rail can either be

provided by the customer or is included in the KSB scope of

supply. The rails are available in 3 and 6 metres.

Smooth raising and lowering of the unit with

pre--assembled guide claw requires that the

guide rail with weld--on extension be installed in a perfectly

vertical position!

The guide rail extension must be welded on in

compliance with the following standards:

weld preparation to

DIN EN ISO 9692

weld quality level C to

DIN EN ISO 5817

general tolerances for welded

constructions B/F

DIN EN ISO 13920

7.10

Commissioning

Prior to the commissioning of the unit ensure

that the minimum liquid level above the

propeller blades is adhered to as stipulated in the operating

instructions of the mixer. If part of the propeller blades were to

protrude above the liquid level or the required minimum level

was not available (air--entraining vortices during operation), the

bearing assembly and the propeller would be subjected to a

non--uniform load. This would cause vibrations and shorten the

useful life of the shaft bearing, mechanical seal, propeller and

installation accessories.
Attach mixer, with guide claw mounted and in gravity--centre

position (cf. section 5.1), to the crane/lifting gear (either directly

to the hoisting rope -- section 5.3 or by means of the lifting hook

-- section 5.2) and place over the guide rail.

The pyramid--shaped sleeve (52--2) facilitates the sliding of the

mixer guide claw over the guide rail. Now lower the unit

including guide claw (732) along the guide rail into the tank until

the elastic rubber base on the motor housing bottoms on the

shell in the pump bracket. Prior to that, the plastic plates of the

claw touch down on the top edge of the pump bracket and the

unit tilts into the horizontal installation position. At this point, you

will notice that the rope slackens a little.
If a lifting hook is used at the end of the hoisting rope, lower the

rope a little bit further until the lifting hook comes off the lifting

clamp (571) and the rope can be pulled in. Note: In order to

choose the same unit position again, mark the rope at the railing

level.
Then fasten the power cable (section 8.1) and the lifting rope

(when using a transportable crane, see section 9.1).
For the instructions on commissioning please refer to the

operating manual of the mixer.
Prior to flooding the tank, check the unit’s direction of rotation.

Prior to beginning the direction of rotation check, ensure

that no one is in the tank near the unit, because the

rotating propeller blades constitute a potential hazard.
If the direction of rotation is correct, the fluid will flow from the

installation parts towards the propeller. The fluid flow must point

away from the propeller.

7.11

Extracting the Unit from the Tank

(e. g. for Maintenance Purposes)

No disassembly steps are required to raise the unit.

Prior to raising the unit, ensure that it has been

de--energised and cannot be inadvertently started. This

entails the separation of all electrical connections (including the

control line). Otherwise there would be a residual potential for

fatal injury!
Raise the unit out of the tank on the rope attached to the lifting

gear. To lower it, proceed in the opposite sequence.

8

Fastening the Power Supply Cable/

Hoisting Rope

8.1

Fastening and Guying the Power Supply

Cable

The power supply cable is fastened to the tank wall by means

of the cable support. This is to avoid the cable sliding back into

the tank and risking being caught by the propeller blades. By

means of a shackle, the cable support can be attached to an

appropriate point (railing/eyebolt). Prior to tightening the cable

support bolts, route the taut cable to the tank edge. Be careful

not to produce any fraying points along the cable. (Pad the rim

of the tank, if necessary).
If possible, the cable should be fastened to the tank edge at a

distance of 0.8 m from the side of the square rail, to prevent

chafing at the guide rail, which would damage the cable.

Electric cables routed with too much slack are

susceptible to damage caused either by constant

flow--induced motion or by the rotating propeller blades.

Carbine hook

Cable support

OW 385775-00

Содержание Amaprop 1200

Страница 1: ...e operating instructions also contain fundamental information about the instal lation and operation of the mixer accessories The responsibility for ensuring compliance with all regulations in force at...

Страница 2: ...er 17 7 5 Mounting the Prefabricated Bracing for Amaprop 2000 2500 with Adjustable Feet without Upper Holder 20 7 6 Mounting the Prefabricated Bracing for Amaprop 2000 2500 Standard Version without Ad...

Страница 3: ...t is imperative to comply with the safety instructions contained in this operation manual the relevant national accident prevention regulations and any of the user s internal work operation and safety...

Страница 4: ...ricated bracings with 2 preassembled feet each For tanks with a max floor gradient of 0 5 4 braces Rigid feet Adjustable feet Rigid feet Adjustable feet 15 LS Pump bracket Amaprop 1200 1801 15 LS Pump...

Страница 5: ...Option Mounting to bridge 15 OH 90 15 OH 45 60 75 Fastened with Composite Anchor Bolts included in KSB s scope of supply or M12 bolts not supplied depending on the building design 200 15 OH 90o 100x10...

Страница 6: ...sion 1 2 Spirit level hammer drill Hard metal drill bits 14 mm 18 Cut off grinder with metal cutting disc Hammer tape rule Lifting tackle Tool for cleaning out drilled hole 1 5 Bolt Tightening Torques...

Страница 7: ...ty of quality and of his liability for any consequential damage Quality of concrete min C20 25 to DIN 1045 or equivalent standards required 3 1 Composite Anchor Bolts Anchor rod with external hexagon...

Страница 8: ...ing times shall be doubled When applied correctly a bulge forms at the upper edge of the drilled hole If there is no bulge the concrete layer is not thick enough refer to values in fig V2 In this case...

Страница 9: ...to a tightening torque of 60Nm If this is not done the lifting clamp may come off during operation and damage the unit or the installation components In this case the mixer cannot be removed from the...

Страница 10: ...ction Forpowercableprotection sliptheprotectivesleeve 719 over the cable end and slide it all the way up to the stop on the cable connector Attach protective sleeve to the lifting clamp 571 using cabl...

Страница 11: ...bracket retaining brackets 8 composite anchor bolts and preassembled bolts nuts and discs and Loctite in carton 15 ST V Brace chemical mortar assembly with 4 braces size 1200 1800 pre assembled with f...

Страница 12: ...ee section 7 9 The guide rail should extend 0 5 metres above the water level 40 mm hole Slip the guide rail 100x100 through the pump bracketuntil ithas reached its ultimate installation position insta...

Страница 13: ...ite supplied M12 bolts of suitable length not included in KSB s scope of supply The position of the required holes diameter 14mm at the bridge should be marked when the guide rail has been placed into...

Страница 14: ...t diameter 18 mm bore depth 125 mm Then fit the 4 composite anchor bolts for the retaining brackets Observe the installation instructions for the composite anchor bolts see section 3 1 Drill a hole wi...

Страница 15: ...bolting retainingthe feet on the braces or bracing assemblies so that the feet can be adjusted vertically Washers have to be fitted on both sides i e underthe bolt heads and under the nuts Mount the b...

Страница 16: ...st The hole pattern data for the composite anchor bolts dimensions FA FB FC are for orientation only itis important thatthe feetrest fully on the floor Observe the installation instructions for the co...

Страница 17: ...ection on the anchor bolt and the manufacturer s application instructions Concrete quality at least C20 25 to DIN 1045 or equivalent standard Min thickness of concrete 160 mm Allowthe composite anchor...

Страница 18: ...mbled feet on the pump bracket using hex head bolts washers on both sides and lock nuts as illustrated below Amaprop 1200 1801 901 550 920 Please note Nuts with counternuts must always be fastened on...

Страница 19: ...en the feetrest fully on the tank floor use slotted holes to adjust The hole pattern data for the composite anchor bolts dimensions FA FB FC are for orientation only itis important thatthe feetrest fu...

Страница 20: ...s of concrete 160 mm Allowthe composite anchorbolts to cure mountthe braces and tighten the bolts Composite anchor bolt M16 Tighten to a torque of 60 Nm secure with Loctite and lock nuts Guide rail Ho...

Страница 21: ...e bolts heads and under the nuts Mount the prefabricated bracing with pre assembled feet on the pump bracket using hex headbolts washerson bothsides and lock nuts as illustrated below Amaprop 2000 250...

Страница 22: ...important thatthe feetrest fully on the floor Observe the installation instructions for the composite anchor bolts given in section 3 1 Note On size 2000 2500 adjustment via the slotted holes is limit...

Страница 23: ...e anchor bolts M 16 tighten to a torque of 80 Nm secure with Loctite and lock nuts Guide rail Holding bracket Install the retaining brackets with chemical anchor bolts M16 tightening torque 60 Nm Secu...

Страница 24: ...x70 920 Nuts M16 550 Discs 16 200 HV Amaprop 2000 2500 901 1 901 2 901 1 550 920 901 1 Hex head bolts M20x80 901 2 Hex head bolts M20x65 920 Nuts M20 550 Discs 20 200 HV Then use a crane to pull this...

Страница 25: ...ufacturer s application instructions supplementary sheet The mortar can only be applied when the tank is empty and dry Do not apply if there is still some minimal water level in the tank rainfall The...

Страница 26: ...s no tightfitbetween the insertsleeve and the guide rail please check whether the correct insert sleeve has been fitted Ident No 11 306 484 for cross section 100x100x3 or ident No 11 306 485 for 100x1...

Страница 27: ...Preparing the Cartridge Application 1 Remove the cap 2 Screw static mixing nozzle into position 3 Place UPM44CX 150 cartridge with plunger into the applicator gun 4 Press out approx 10 cms of materia...

Страница 28: ...time processing time 5 C 13 min 20 C 5 min 30 C 4 min 40 C 2 min Temperatur in anchoring material Curing time 5 C bis 0 C 24 h 0 C bis 5 C 3 h 5 C bis 10 C 90 min 10 C bis 20 C 60 min 20 C bis 30 C 4...

Страница 29: ...the rope slackens a little If a lifting hook is used at the end of the hoisting rope lower the rope a little bit further until the lifting hook comes off the lifting clamp 571 and the rope can be pull...

Страница 30: ...5 mm steel cable from the winch of the lifting gear in the case of transportable crane type 4 2 4 4 4 6 or 4 8 belonging to the KSB scope of supply wrap the entire length of cable around the rope ten...

Страница 31: ...on for Tank Floor Irregularities up to 15 mm Tightening torque 1 M16 x 190 60 Nm 2 M12 x 45 60 Nm 3 4 M16 x 70 160 Nm 5 M16 x 160 150 Nm Size 2000 2500 Tightening torque 1 M16 x 190 60 Nm 2 M12 x 45 6...

Страница 32: ...opR 32 Exploded View of Installation Part Amaprop 1200 1801 with Adjustable Feet for Tank Floor Gradients up to 1 5 Tightening torque 1 M16 x 190 60 Nm 2 M12 x 45 60 Nm 3 M16 x 70 168 Nm 4 M16 x 160 1...

Страница 33: ...Installation Part Amaprop 2000 2500 with Adjustable Feet for Tank Floor Gradients up to 1 5 Tightening torque 1 M16 x 190 60 Nm 2 M12 x 45 60 Nm 3 M20 x 65 250 Nm 4 M20 x 80 250 Nm 5 M16 x 160 150 Nm...

Страница 34: ...propR 34 Exploded View of Installations Parts Option Upper Guide Rail Holder Tightening torque 5 M12 x 160 40 Nm 5 5 5 5 Use metal shims if necessary Install without transmitting any stresses or strai...

Страница 35: ...12 167 V 88 1600 54URG YRG SP 190 12 212 V 81 1600 44URG YRG SP 190 12 210 V 77 1600 44URG YRG SP 190 12 210 V 66 1600 34URG YRG SP 189 12 172 V 62 1600 24URG YRG SP 189 12 170 V 58 1600 24URG YRG SP...

Страница 36: ...4URG YRG SP 189 11 184 V 50 2200 54URG YRG SP 190 9 228 V 46 2200 44URG YRG SP 190 9 226 V 43 2200 44URG YRG SP 190 9 226 V 39 2200 34URG YRG SP 190 10 205 V 35 2200 24URG YRG SP 190 10 203 V 32 2200...

Страница 37: ...06008 Halle Saale D 06110 Halle Saale Ersatzteilabteilung Fax 49 345 48 26 4691 Tel 49 345 48 26 0 From In order to ensure the smooth processing of your spare parts inquiry we request that you let us...

Страница 38: ...AmapropR...

Страница 39: ...AmapropR...

Страница 40: ...4 10 10 08 2006 Subject to modification without notice KSB Aktiengesellschaft P O Box 200743 06008 Halle Saale Turmstra e 92 06110 Halle Germany Tel 49 345 48 26 0 Fax 49 345 48 26 46 99 www ksb com...

Отзывы: