
Start-up
41
Pos: 94.25 /Ü berschriften/Ü berschriften 2/F-J/GGel enkwelle monti eren @ 2\mod_1202398342788_78.docx @ 59253 @ 2 @ 1
7.5
Install the PTO shaft
Pos: 94.26 /BA/Inbetri ebnahme/EasyCut/Anbau Gel enkwell e/Anbau Gelenkwelle @ 3\mod_1204702102883_78.docx @ 71462 @ @ 1
2
1
Fig. 18
• Swivel the PTO shaft bracket under the Weiste triangle
• Push the PTO shaft (1) onto the front PTO shaft of the tractor and secure
• Secure the PTO shaft guard against turning with the retaining chain (2).
Pos: 94.27 /Layout Module /---------------Seitenumbr uch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание EasyCut F 280
Страница 33: ...Commissioning 33 Fig 9 Pos 92 12 Layout Module Seitenumbr uch 0 mod_1196175311226_0 docx 4165 1 ...
Страница 95: ......