III - 4
Before and After Use
3.2.4 Electrical Supply
•
Connect the lighting equipment connection cable (2) to
the 7-pin tractor electrical system plug-in connector.
•
Position the cable so that it will not come in contact
with the wheels.
•
Install the control console so that it is easily visible to
the driver.
•
Connect the power supply cable (DIN 9680) to the 3-
pin power supply plug.
3.2.6 Compressed Air Connections for the
Air Brake
(Special Equipment)
Insert the coloured compressed air hose couplings (1)
into the corresponding (same colour) coupler sockets on
the tractor and lock them into position.
Always insert and lock the yellow air brake
coupling first. Detach the couplings in
reverse order.
For road driving, the air brake should be
set in the "Full Load" position (2) only.
In the "half load" or "zero load" position,
the braking effect can be adapted (reduced),
e.g. when working on a wet meadow.
KR-1-044
2
If the tractor is not equipped with this
connection – order the socket and
connecting cable from the Replacement
Parts Service. (Part no. 0303-914-0)
CP102220
1
1
2
1
KR200031
1
RPN00075
3.2.5 Use Safety Chain
The safety chain (1) is used as additional protection of
tailed machines, if they should disengage from the
adjustable drawbar during the transportation.
Attach the safety chain (1) with the corresponding
mounting parts to the adjustable drawbar support of the
tractor or another stated hitching point. The tolerance of
the safety chain should be just as high that curves can be
driven.
The attachment of safety chain is not
compulsory in all countries.
An extension cable for the control panel can be ordered
under the following spare parts numbers:
•
303 174 0
(2500 mm length)
•
302 959 0
(5000 mm length).
Содержание Comprima F 125
Страница 10: ...Contents 8 ...
Страница 28: ...II 12 Safety 6 8 9 3 5 VPN00003_2 7 10 10 C O M PR IM A XC 10 7 ...
Страница 32: ...II 16 Safety ...
Страница 42: ...III 10 Before and After Use ...
Страница 76: ...V 28 Basic Settings and Operation ...
Страница 178: ...IX 12 Maintenance VP100101 1 Z 2a 9 H L 4 a1 11 12 I II 5 3 3 2b a2 H L 6 Z m in 0 2a 2b 7 7 ...
Страница 198: ...X 2 Winter Storage ...
Страница 228: ...A 24 Appendix ...
Страница 232: ...ISOBUS operation B 4 ...
Страница 233: ......