
3
INSTALLATION
18
OPTISYS SLM 2100
www.krohne.com
01/2017 - 4002737304 - MA OPTISYS SLM 2100 R04 en
3.4.1 Mounting of the sludge level meter
Due to many different applications and installation points of sludge level meter a standardised
mounting is often not applicable. To overcome the problem of the local conditions three different
opportunities exist to order the mounting of the sludge meter.
Available mounting possibilities
Available mounting possibilities
Available mounting possibilities
Available mounting possibilities
INFORMATION!
To ensure proper assembly, please use only the mounting material provided with the meter.
INFORMATION!
All bolts, nuts and washers should be greased to prevent cold welding and ensure simple
disassemble after use.
INFORMATION!
Please ask a second person to help with this procedure.
INFORMATION!
Ensure that the handrail is suitable for the weight of the mounting frame and the device
(standard: 26.5 kg / 58.4 lbs, with cleaning unit: 31kg / 68.3 lbs); otherwise support the handrail
with additional material. The operator is responsible for safe installation, especially against the
fall in the sedimentation basin.
Содержание OPTISYS SLM 2100
Страница 5: ...CONTENTS 5 www krohne com 01 2017 4002737304 MA OPTISYS SLM 2100 R04 en OPTISYS SLM 2100 8 Notes 85 ...
Страница 85: ...NOTES 8 85 OPTISYS SLM 2100 www krohne com 01 2017 4002737304 MA OPTISYS SLM 2100 R04 en ...
Страница 86: ...8 NOTES 86 OPTISYS SLM 2100 www krohne com 01 2017 4002737304 MA OPTISYS SLM 2100 R04 en ...
Страница 87: ...NOTES 8 87 OPTISYS SLM 2100 www krohne com 01 2017 4002737304 MA OPTISYS SLM 2100 R04 en ...