
Rev. Date: 12/14/10
Page 14
MODEL #5200-P
OPERATING INSTRUCTIONS
Starting Your Krendl Model 5200-P Machine:
1) After installing your Model #5200-P according to the installation instructions, it is now time to start
your machine. Again, check all fluid levels, belt tension, and that all guards are installed properly.
2) Attach the blowing hose to the machine and run the hose into the building.
3) Run the remote control cord into the building.
4) Make sure the Control Switch on the remote control cord is in the OFF position. Now, you may plug
in the remote control cord.
5) With truck engine running engage PTO. Make sure PTO is running at proper speed. (With Main
Disconnect ON generator voltmeter should read 120 volts.)
6) Your machine is now ready for operation.
Note:
Agitator motor and blower should only be operated with steady or constant flow of electricity
between 110-120 volts.
Note:
When using extension cords, wire gauge size should not be less than input cord on unit and
not exceed 50' in length.
(See Voltage Drop Chart Below.)
Ex: A two-wire 20-ampere circuit using 12 AWG with a one-way distance of 25 feet will drop 1.98 volts;
120 volts - 1.98 volts = 118.02 volts as the load voltage.
Содержание 5200-P
Страница 28: ...Rev Date 12 14 10 Page25 MODEL 5200 P PARTS LIST 5200 Exploded Parts View Unidirectional Center Down ...
Страница 29: ...Rev Date 12 14 10 Page26 MODEL 5200 P 5200 Exploded Parts View ...
Страница 30: ...Rev Date 12 14 10 Page27 MODEL 5200 P 5200 Exploded Parts View ...
Страница 36: ...Rev Date 12 14 10 Page33 MODEL 5200 P SERVICE RECORD DATE MAINTENANCE PERFORMED COMPONENTS REQUIRED ...