WAKL5N0802A
Edition: 07.02.2022
Page: 14/18
4.2. Function check of the evaporator blowers
Take the air conditioner into operation.
Open quick fasteners by rotating motion, open side covers.
Function check of all evaporator blowers.
4.3. Visual check of safety fuses
Open service cover in the passenger compartment below the right corner of the roof installation
with a square spanner.
Take fuses one-by-one out of their sockets, check and put back again.
Close cover when finished.
UL500 EM
UL700 EM
4.4. Plug connection check for tightness
Open service cover in the passenger compartment below the right corner of the roof installation
with a square spanner.
Check tight fit of plugs and electric connections. Close Cover when finished.
4.5. Visual check of electrical cables for abrasion
Open quick fasteners and side covers.
Take fan plate of the condenser fans out and check all electrical
connections for correct placement and abrasion.
When finished, remount fans and close side cover.
.
Quick fasteners
Evaporator blowers
F1-F6 = 15A
F8 = 7,5A
F1-F11 = 15A
F15 = 7,5A
Danger! Risk of injury!
Take special care near hot, rotating or live parts.