![Kongsberg Simrad Mk3 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/kongsberg/simrad-mk3/simrad-mk3_installation-manual_1992574012.webp)
12
110-0001063/A
A suitable location for the Operating Panel must be chosen before the installation starts.
Observe the limitations due to the cable lengths. We recommend that the Operating
Panel is positioned in the same physical direction as the display, so that "up" on the
operating panel is the same as "up" on the display. Experience has shown that this will
make it easier to use the trackball on the operating panel when you wish to control
the cursor on the display.
Procedure
1
Prepare the location and the necessary tools.
Note
To allow future maintenance, you must mount the unit with its cables and connectors
available for easy access.
2
Drill and cut the panel opening as shown in drawing 476352.
3
Mount the Operating Panel using the supplied hardware.
The necessary mounting hardware (four screws, four nut plates and four bolt covers)
are supplied in the standard delivery.
a
Position the four nut plates shown in the illustration.
b
Use a 3 mm Allen key to fasten the four special bolts.
c
Mount the bolt covers in the four corners of the Operating Panel.
4
Connect the USB cable to the Operating Panel.
Note
When you connect the cable, make sure that it is properly secured, and able to
withstand the vibration and movements of the vessel.
Simrad Installation Manual
Содержание Simrad Mk3
Страница 4: ...4 110 0001063 A Simrad...
Страница 14: ...14 110 0001063 A Simrad Installation Manual...
Страница 15: ...110 0001063 A 15 Installation...
Страница 37: ......
Страница 38: ...2022 Kongsberg Maritime...