68
451253/A
The Tx transducer array is physically positioned in the fore-and-aft direction under
the hull.
The Tx-elements are connected to the SBP 29 Transceiver Unit via Cable Connection
Units (CCUs). Like the Tx-elements, each CCU has an individual serial number, and
you can select any CCU you wish and place them in random order in the frame. Each
CCU has 24 cables numbered from 1 to 24 towards the Tx-elements, and 2 cables
marked with CCU<S/N> cable 1 and CCU<S/N> cable 2. These cables are moulded into
the CCU, and the two cables towards the SBP 29 Transceiver Unit are terminated with
25-pins male D-sub connectors.
During installation, CCU cable 1 of the most forward CCU is marked M1-1, while CCU
cable 2 is marked M1-2. The cables from the second CCU (counted from bow to aft)
are marked M2-1 and M2-2 and so on.
Cables between CCU and SBP 29
CCU number
Marking of cables
Sockets SBP 29
1
M1-1
M1-2
SIHD8 #1
SIHD8 #2
2
M2-1
M2-2
SIHD8 #3
SIHD8 #4
3
M3-1
M3-2
SIHD8 #5
SIHD8 #6
4
M4-1
M4-2
SIHD8 #7
SIHD8 #8
Transducer elements number 1, 2 and 3 are the most forward elements. Element number
1 is on the port side, element number 2 is in the middle and element number 3 is on the
starboard side. They are connected to transducer cables 1, 2 and 3 of the most forward
CCU, respectively. The elements of the second row are numbered 4, 5 and 6 from port
to starboard, and are connected to cables 4, 5 and 6 of the CCU. This continues up to
element 25, which then must be connected to cable 1 of the next CCU.
We recommend installation of 24 Tx elements and a single CCU at a time, starting
forward and proceeding towards the back. Always mark cables in the technical room
(M<n>-1 / M<n>-2) and write down the serial number of the CCU before continuing
with the next group of 24 Tx elements.
Note
Remember to always make a note of the CCU and the Tx element serial numbers in the
tables in CCU cable labelling.
SBP 29 Installation Manual
Содержание SBP 29
Страница 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Страница 57: ...451253 A 57 Cable plan overview Overview of the SBP 29 cable plan Cable layout and interconnections ...
Страница 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Страница 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Страница 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Страница 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Страница 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Страница 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Страница 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Страница 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Страница 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Страница 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Страница 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Страница 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Страница 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Страница 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Страница 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Страница 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Страница 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Страница 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Страница 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Страница 151: ......
Страница 152: ... 2019 Kongsberg Maritime ...