451253/A
131
Compass deviation requirements
SBP 29 units that are installed on the bridge may have an effect on the compass.
Once the installation is complete, the vessel must be swung with the SBP 29 in both
operative and inoperative modes.
The shipowner and captain are responsible for updating the compass deviation table
accordingly with regard to the vessel’s national registry and corresponding maritime
authority.
Noise sources
The operational performance of the SBP 29 Sub-bottom profiler depends on the noise
conditions. It is essential that the noise signature is as low as possible.
The vessel’s hull, rudder(s) and propeller(s) must be thoroughly inspected in dry dock
prior to installation.
Roughness below the water-line deformities in the shell plating and protruding obstacles
can create underwater noise. These sources of turbulence must be smoothed or removed
as best as possible.
Note
It is especially important that the propeller(s) are not pitted or damaged.
Dry docking requirements
Whenever devices for hydroacoustic use are mounted under the vessel’s hull, special
considerations must be made prior to dry docking.
Do not place supporting blocks or structures in the vicinity of the SBP 29.
The location of the SBP 29 must be noted on the vessel’s docking plan for future
reference.
Prior to dry docking, power down the SBP 29. Disengage the circuit breaker if necessary.
Label the Hydrographic Work Station and/or the circuit breaker clearly to prevent anyone
from powering up the SBP 29 accidentally.
Содержание SBP 29
Страница 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Страница 57: ...451253 A 57 Cable plan overview Overview of the SBP 29 cable plan Cable layout and interconnections ...
Страница 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Страница 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Страница 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Страница 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Страница 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Страница 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Страница 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Страница 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Страница 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Страница 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Страница 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Страница 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Страница 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Страница 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Страница 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Страница 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Страница 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Страница 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Страница 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Страница 151: ......
Страница 152: ... 2019 Kongsberg Maritime ...