140
451253/A
Unpacking transducers, page 143
Unpacking standard parts and units
Prior to installation or use, parts and units must be inspected, and then unpacked from
their transport boxes. It is important that this unpacking is done without inflicting
damage to the equipment.
Context
This procedure provides the basic tasks of unpacking units (main unit, spare parts etc)
from boxes shipped from Kongsberg Maritime.
Note
If the unit in question is not unpacked for immediate use, you may consider storing it
unopened in its original box. However, it may be useful to open the box to check its
contents for damage and retrieve any accompanying documentation.
Do not use a knife to open cardboard boxes - the contents may be located close to the
surface, and can then be damaged by the blade.
Procedure
1
Check the carton before opening it to ensure it shows no signs of dropping,
immersion in water or other mishandling.
1
If external damage is detected, open the box to check its contents.
2
Request that a representative of the carrier to be present while the box is
opened, so any transportation damage can be identified and documented.
3
If a unit has been damaged, prepare an inspection report stating the condition
of the unit and actions taken.
Describe the damage, and collect photographic evidence if possible. Return
the inspection report to Kongsberg Maritime as soon as possible.
2
Place the box on a stable work bench or on the floor with the top of the box facing
upwards.
3
In the absence of other instructions, always open the top of the carton first.
The contents of the box will normally have been lowered into the carton from
above, so this will usually be the easiest route to follow. Be careful when you open
the box, and make sure that the contents are not damaged. Do not use a knife to
open cardboard boxes.
SBP 29 Installation Manual
Содержание SBP 29
Страница 1: ...451253 A November 2019 Kongsberg Maritime AS SBP 29 Sub bottom profiler Installation Manual ...
Страница 57: ...451253 A 57 Cable plan overview Overview of the SBP 29 cable plan Cable layout and interconnections ...
Страница 111: ...451253 A 111 Figure 12 862 216859 Drawing files ...
Страница 112: ...112 451253 A Figure 13 307904 SBP 29 Installation Manual ...
Страница 113: ...451253 A 113 Figure 14 862 218001 Drawing files ...
Страница 114: ...114 451253 A Figure 15 871 219193 SBP 29 Installation Manual ...
Страница 115: ...451253 A 115 Figure 16 871 219201 Drawing files ...
Страница 116: ...116 451253 A Figure 17 388168 SBP 29 Installation Manual ...
Страница 117: ...451253 A 117 Figure 18 871 219187 Drawing files ...
Страница 118: ...118 451253 A Figure 19 821 219199 SBP 29 Installation Manual ...
Страница 119: ...451253 A 119 Figure 20 388235 Drawing files ...
Страница 120: ...120 451253 A Figure 21 871 219198 SBP 29 Installation Manual ...
Страница 121: ...451253 A 121 Figure 22 388148 Drawing files ...
Страница 122: ...122 451253 A Figure 23 315550 SBP 29 Installation Manual ...
Страница 123: ...451253 A 123 Figure 24 430751 Drawing files ...
Страница 124: ...124 451253 A Figure 25 871 212984 SBP 29 Installation Manual ...
Страница 125: ...451253 A 125 Figure 26 407070 Drawing files ...
Страница 126: ...126 451253 A Figure 27 448231_1A SBP 29 Installation Manual ...
Страница 127: ...451253 A 127 Figure 28 427512 Drawing files ...
Страница 128: ...128 451253 A Figure 29 435680 SBP 29 Installation Manual ...
Страница 129: ...451253 A 129 Figure 30 444783 Drawing files ...
Страница 151: ......
Страница 152: ... 2019 Kongsberg Maritime ...