UAB AMALVA we reserve the right to make changes without prior notice
5
V2-C5-15-03-v1
1. VERSO AIR HANDLING UNITS
UAB Amalva thanks you for choosing VERSO air hadling unit. Because a lot of attention is given towards unit
quality we will be thankful for your help expressing your comments and responses, or suggestions regarding
technical and running qualities of the unit.
To avoid misunderstandings, before installing the unit, carefully read this instruction. Keep the instruction,
warranty and technical information data – you may need them during exploitation.
Inspect the air handling unit carefully to make sure it was not damaged dur-
ing transportation.
More detailed information about the parameters of the VERSO air han-
dling units can be found in the AHU’s printout (technical specifications).
Do not switch on an ungrounded air handling unit.
Before switching on the unit, all doors must be closed and locked;
the safety covers should be bolted.
Before switching on the unit, its compartments have to be fixed fast among
them.
There is pressure inside the air handling units;
this is why it is forbidden to open any doors before switching off the unit.
Before performing any inspection work inside the unit, be sure the unit‘s
electric power supply is disconnected and there are no rotating parts.
Before opening the doors, switch off the unit and it‘s main switch and wait
for 1–2 minutes till the fans will stop rotating.
Before switching on the air handling unit, activate all the safety functions.
The air handling unit can be switched on or off only by the means specified
in the control system.
Be careful when doing water air heater assemblage works - heat exchan-
ger can get as hot as 130 °C!
Warning:
If the air handling unit does not have the manufacturer’s control system,
then the company that installed automation is responsible for the unit’s
functioning and safety reliability.
Risk areas with rotating parts.
Moving parts are the fan impeller, drive pulleys of the rotary heat exchan-
ger, if fitted, and by-pass/shut-off damper of the plate heat exchanger, if
fitted. The lockable inspection doors serve as protection from contact with
the fans and the heat exchanger. If the fan outlets aren’t connected to any
duct, they must be fitted with a protective screen (wire mesh).
Attention:
After initial unit start-up, also every time after replacing of the filters, it’s
necessary to perform clean filters calibration procedure (see 6.9.5 Chap
-
ter).
Содержание VERSO-P
Страница 1: ...VERSO S R P RHP PCF EN Installation and Maintenance Service Manual C5 ...
Страница 2: ......