UAB AMALVA we reserve the right to make changes without prior notice
23
V2-C5-15-03-v1
VERSO sections connection using clamping elements
View B
View C
View A
The sections clamping elements are supplied to the device. They are used in the front and back of the unit in the
upper part of the section. Sections are tightened with screws in the frame holes (image A). Tightening the two
equal in height single-flow sections clamping elements are located on the top of section, and if allows unit con
-
struction, on the sides of the section (image B). First, the individual elements are screwed on the same height on
the two different sections, and then using the clamping screw and nut sections are joined (view C). Prior to joining
all the sections must be sealed with a gasket 12×6 (supplied to the device).
Cleaning and Inspection of Coil Heat Exchanger
Always clean against the regular direction of airflow. Make sure that the coils are purged of air. If a droplet elimina
-
tor is fitted, remove it and fush it clean with water. Also check that the condensate drain is not clogged.
Содержание VERSO-P
Страница 1: ...VERSO S R P RHP PCF EN Installation and Maintenance Service Manual C5 ...
Страница 2: ......